My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-09-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 06-09-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:50 PM
Creation date
11/10/2006 4:06:28 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> I CITY OF ARDEN HILLS <br /> -- MEMORANDUM <br /> DATE: June 3, 1997 <br /> I TO: Brian Fritsinger, City Administrator y> <br /> I FROM: Dwayne Stafford, Public Works Superintendent <br /> I SUBJECT: Sewer Televising Report <br /> Backvound <br /> I The Public Works Department had contracted out cleaning and televising of approximately <br /> 23,000 feet of sanitary sewer lines last winter, as a result of the Metropolitan Council's grant of <br /> $10,000 to Arden Hills for inflow and infiltration study. <br /> I Having reviewed the video tapes from televising, the Public Works Superintendent realizes that a <br /> I substantial amount of work is necessary to insure continued service from these lines. <br /> Problems Identified <br /> Ie Several segments of sewer line are leaking badly. Clean ground water is getting into the system <br /> through cracks and bad joints. (infiltration) <br /> I One area on Lake Lane has approximately 3' of line where the top of the pipe is missing. <br /> Many areas have significant root problems which the television camera could not penetrate. <br /> I Corrective Repairs <br /> Trenchless sewer repair is a relatively new technique. It is now possible to repair most defects <br /> I from above ground without disturbing any ()fthe surrounding area Typically, this method of <br /> repair is much cheaper and more resident friendly, <br /> I Today's technology allows chemicals to be forced through a leaking joint, which solidify the <br /> soils around the pipe, and stop the leak 100 percent. We can install short segments of pipe liner <br /> I as was done on Oak Avenue, which corrected pipe failures of2' to 6' in length. It is also <br /> common to reline entire segments of sewer pipe from manhole to manhole. <br /> I Recommendation <br /> The Public Works Superintendent recommends Council allow the City Engineers to assess the <br /> corrective measures needed and prepare a report indicating the type of repairs recommended. <br /> I Attached is a memo indicating the costs incurred by the City for this report, which willamonnU"- <br /> approximately $3,000. <br /> fI Enclosure <br /> I <br /> --------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.