Laserfiche WebLink
<br /> .. 1_'- fL I <br /> -- BE:NSHOOF & ASSOCIATES, INC. <br /> ~ I <br /> TRANSPORTATION ENGINEERS AND PLANNERS .. <br /> 7301 OHMS LANE, SUITE 500 1 EDINA, MN 554391 (612) 832.9858 I FAA (6 t 2) 832-9564 <br /> -------- <br /> I <br /> June 23, 1997 REFER TO FilE: 96-53 <br /> I <br /> DETAILS ON TRIP GENERATION FOR THE ARDEN HILLS G..\TI.:WAY <br /> BUSINESS CENTER' I <br /> Weekday p.m. feak Houl' Trip Genel'ation I <br /> Phase & Size in sq. ft. Office Trips2 Warehouse TripsJ Total I <br /> #1 -- 154,264 78 91 169 I <br /> #2 -- 104,532 59 62 121 <br /> #3 -- 115,575 63 68 131 <br /> #4 -- 111,779 62 66 128 .. <br /> Total of four phases: 262 287 549 <br /> I <br /> Weekday Daily Trip Generation <br /> P~_ase ~. Si?=.(linJq.~, Q.~ce Tripi WarehQlIse 1:dp~J l.Qlil I <br /> #1 -- 154,264 577 602 1179 . I <br /> #2 -- 104,532 430 408 838 . <br /> #3 -- 115 575 464 451 915 I <br /> , <br /> #4 -- 111,779 452 436 888 <br /> Total of four phases: 1923 1897 3820 I <br /> I 1111s !able presents the trip generation for the development described in the EA W project d~eription. 1 <br /> The traffic forecasts presented in the EAW (802 weekday p.m. peak hour trip ends and 5,106 weekday <br /> daily trip ends) were based on outdated developmenl statistics presented to Benshoof & Associates staff. <br /> 2 Based on 20% of floor area used for office space as presenled in the EA W. The filled curve equation for I <br /> General Office Building (110) land use of Trip Generation, 5th edition, Institute of Transportation <br /> Engineer's, 1991, is applied 10 office space. .. <br /> 3 Based on 80% of floor area used for warehousing space as presented in the EA W. The average rate for <br /> Warehousing (150) land use of Trip Generation, 5th edition, Institute of Transportalion Engineer's, 1991, <br /> is applied 10 warehousing space. I <br />