My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-14-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 07-14-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:53 PM
Creation date
11/10/2006 4:06:40 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ------- - <br /> -- --- - <br /> Jul-02-97 04:58P HKS Associates, Inc~ 612-659-0891 P.04 'I <br /> Yfs <br /> Page 3 1 <br /> July I, 1997 <br /> Kevin Ringwald, City Of Arden Hills <br /> Re: Gateway Business Park -. <br /> 12. Parking Setback <br /> . A variance is requested for parking setback south of Phase 2 building. 1 <br /> 13. Screening of Trash Containers <br /> . Please refer to separate correspondence and discussion with Welsh Development regarding 1 <br /> screening of trash containers. <br /> 14. Pond Emergency Overflow 1 <br /> . Ponding area emergency overflows will be directed to public right-of-way including streets <br /> and Round Lake. <br /> 15. Pond Side slopes 1 <br /> . Pond side slopes of 3: I is acceptable to Rice Creek Watershed District. Due limited <br /> availability of ponding space, side slopes of 4; I or 6: I are not achievable. 1 <br /> 16. Drainage from Parking and Driveway Areas <br /> . Additional catch basins will be installed at driveways to collect runoff from parking and 1 <br /> driveway areas. <br /> 17. Phase 3, North Driveway ~ <br /> . The slope on this driveway has been reduced to about 5 or 6 percent. No trucks will be using <br /> this driveway. <br /> 18. Sewer and Water Utilities 1 <br /> . Easements will be granted on any public utilities, if any, within the respective phases. <br /> 1 <br /> Page 3, Letter of June 20, 1997 <br /> 19. Common Lot Line Between Phases 311nd 4 , 1 <br /> ,. Please refer to separate correspondence and discussion with Welsh Development regarding <br /> the common lot line between Phases 3 and 4. 1 <br /> 20. Out faU at Pond 6 (Mitigated Wetland) <br /> . The out fall has been relocated and an easement will be obtained from U. S. Fish and 1 <br /> Wildlife. <br /> 21. Highpoint Elevations and Drainage Arrows 1 <br /> . Highpoint elevations and drainage arrows will be added to final plans. <br /> 22. Drainage Area Maps 1 <br /> . Drainage area maps will be provided with final plans. <br /> .. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.