Laserfiche WebLink
<br /> 1 Jul-02-97 04:58P HKS Associates, Inc. 612-659-0891 P.03 <br /> 1 Page 2 :J/S <br /> July J. 1997 <br /> Kevin Ringwald, City Of Arden Hills <br /> it Re: Ga[eway Business Park <br /> Our responses to the other items identified by Mr. Stonehouse are as follows: <br /> 1 1. Plan Signatures <br /> . The submitted plans are preliminary plans. Final Construction Document drawings will be <br /> 1 signed by a registered professional. <br /> 2. Access to Vaughan Property. <br /> . Access has been revised to occur on developer's property from the Cul-de-sac directly into <br /> 1 the Vaughan property. <br /> Page 2, Letter of June 20, 1997 <br /> 1 3. Storm Drainage Pond Easements <br /> . Rice Creek Watershed District requires easements on all new ponds and mitigated wetland. <br /> 1 These easements have been included on the Preliminary Plat. <br /> 4. Discharge of Storm Water Runoff <br /> 1 . Rates of Storm water discharge from on-site holding pond are limited to the Pre-development <br /> condition rate ofrunotI. These ponds discharge into a new storm sewer in 14". Street which <br /> Ie is proposed to discharge into a new regional pond south of the railroad track ne<U' Round <br /> Lake Road. <br /> S. Watennain Removal <br /> 1 . Grading will require removal and replacement of existing watermain north of Phase 2. <br /> 1 6. Watermain Looping <br /> . Watermain will be looped north and east of Phase 2 building. <br /> 1 7. Hydrant Spacing <br /> . Plans have been submitted to Mr. Don Szurek, Fire Marshall, Lake Johanna Fire Department <br /> for his review and approval. , <br /> 1 8. Copy of Easement Document <br /> . A copy of this document has been submitted to you. <br /> 1 9. Pondlng Improvements In Existing Easements <br /> . Approvals will be obtained from agencies, including NSP, where ponding improvements lie <br /> 1 within existing easements. <br /> 10. Access Easement Vacation <br /> . Access easement 1717596 will be vacated prior to final plat approval. <br /> 1 <br /> n. Construction of Gateway Court (Round Lake Court> <br /> we . Please refer to sep<U'ate correspondence from Welsh Development regarding covenants. <br /> 1 <br /> -- --- -- ----- ----- <br />