My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-11-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 08-11-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:54 PM
Creation date
11/10/2006 4:06:53 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Su.)')'2~1 KJl...V'-~:6"">\5 , '1 <br /> ARDEN HILLS CITY COUNCIL - JULY 14. 1997 13 <br /> Councilmember Hicks inquired if there was a rendering of the view for Phase III and IV from the I <br /> southwest corner looking into the "I" area. Mr. Joe Favre, HKS, showed this rendering. .. <br /> Councilmember I-licks statcd that he shares the concern of Mayor Probst with the aesthetics of <br /> the view of the loading dock arca, especially regarding brick banding around the building. Mr. I <br /> Sloat stated the plans call for contrasting brick around the bottom. He showed the color scheme <br /> for thc project, and stated the Phase II-IV buildings would not be as bright as Phase I, which <br /> would provide a more upscale look. I <br /> Mayor Probst inquired ifthc applicant would consider banding brick all the way around the <br /> buildings. Mr. Sloat replied the landscaping would cover the brick in a matter of a few ycars, I <br /> and they were dcpending more on visual elemcnts to tie the buildings togethcr. <br /> Councilmember Hicks inquired as to the depth ofthc bays. Mr. Sloat replicd they were about 45 I <br /> feet deep. <br /> Mayor Probst asked for a motion on this issue. I <br /> MOTION: Malone moved to approve the Planned Unit Development (PUD), including <br /> variances and Preliminary Plat in Planning Case #97-06; subject to the twenty-six I <br /> (26) conditions listed in Mr. Ringwald's memorandum dated July 14, 1997, <br /> recognizing that fourtcen (14) of those conditions have been met to-date; subject ~ <br /> to the recording of all nccessary easements and related land documents; and <br /> recognition by the City that the apparent intent of the developer, architect and <br /> landscape architect is to modify the structure to add additional significant relief to I <br /> the corners that are visible from thc rclocated Fourteenth Street. Hicks seconded <br /> the motion. <br /> Following additional discussion, Malone moved to amend the motion to include I <br /> that elevations of those modifications proposed by Welsh Companies will be <br /> available for review and consideration by the Council prior to approval of the I <br /> Final Plat. <br /> Further discussion ensued, with Administrator Fritsinger specifically referring to Mr. Ringwald's I <br /> previous comments regarding Condition #21, and to Condition #24 regarding all development <br /> agreements. Mr. Fritsinger referred to the pending issues of the property acquisition from I <br /> Naegele, finalization of a Purchase Agreement for the former Kem Milling site, and a basic <br /> Development Agreement for the scope of the project. <br /> Malone amended, and Hicks seconded, the standing motion to include those I <br /> clarifications as referenced above. <br /> The motion carried unanimously (5-0). I <br /> .. <br /> I <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.