Laserfiche WebLink
<br /> _ MS~ <br /> Howard R, Green Company Ii 1 <br /> fOISILTI\GE\lI\EERl <br /> CONSULTING ENGINEERS Formerly MSA <br /> Consulting Engineers <br /> MEMORANDUM <br /> TO: Dwayne Stafford <br /> Public Works Superintendent <br /> City of Arden Hills <br /> FROM: John R. Hemming, P.E. <br /> DATE: August 8, 1997 <br /> RE: 1,000,000 (1.0 MG) Water Tower <br /> Maintenance and Repairs <br /> FILE: 520-085M 0060 <br /> As directed, we have prepared specifications for the 1.0 MG water tower maintenance and <br /> -_ repair work and will present the specifications at the August 11, 1997, Council meeting for <br /> approval. <br /> - The specifications detail the following work items: <br /> - . Minor steel modifications to provide adequate toe clearance where the tower ladder <br /> I penetrates the condensate ceiling. <br /> . Repair of a 10 square foot area of peeled paint in the access tube. <br /> . Removal of mildew stains. <br /> . Tank lining repairs consisting of spot sandblasting and painting. <br /> I . Replacing the metal vent screen with a fiberglass reinforced nylon screen less susceptible to <br /> icing. <br /> I We believe that this work can be completed for under $25,000, and therefore recommend that <br /> quotes be solicited from several reputable contractors. <br /> I The specifications indicate that the work can be completed in September 1997, or May 1998. <br /> The City can determine which schedule to award after receiving quotes. <br /> I Necessary repair work resulting from the installation of communications equipment is not <br /> included in the specifications, as these repairs should be completed by the communications <br /> company at their cost. <br /> I Please feel free to call with any questions about this project. <br /> ~ JRH:pd <br /> I O:\PROJ\520085m\085-0717.aug.doc <br /> 1326 Energy Park Drive . SI. Paul. MN 55108 . 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br />