<br /> I <br /> I CITY OF ARDEN HILLS <br /> i' MEMORANDUM <br /> DATE: August 14, 1997 <br /> I TO: Brian Fritsinger, City Administrator <br /> I FROM: Cindy S. Walsh, Parks and Recreation Director <br /> SUBJECT: August Monthly Report <br /> I Trail Sealcoating <br /> I The trail areas around Floral and Cummings Park are scheduled to be sealcoated with the slurry <br /> seal by the end of August. These trail areas have been crack sealed and cleaned off in <br /> preparation for applying the slurry mix. <br /> I Dama2:e to Trail <br /> During the construction ofa retaining wall at 4308 Colleen Court, the contractor of the project, <br /> I damaged the trail. They were using a backhoe and a skid steer to construct the wall. When I <br /> approached the foreman, he informed me that the damage was done by the backhoe prior to his <br /> arrival. I was told to contact the developer, John Gurtek. The skid steer was parked on the trail <br /> Ie at the time and I asked him not to use the trail as an access. <br /> I am in the process of obtaining cost estimates to repair the damage. I have also written a letter <br /> I to John Gurtek informing him that he is responsible for the cost of repairing the damage. <br /> I Trail Grant Application for Countv Road F <br /> I have been informed by the Minnesota DNR that they received 32 requests for funding totaling <br /> $1,000,000. They received $200,000 from the legislature to distribute to grant recipients. The <br /> I top four projects will receive funding. Unfortunately, our project is fifth. However, should one <br /> or more of the first priority projects fail to go to contract or withdraw from the program, funds <br /> will be available for our project. I will keep you informed as I receive additional information. <br /> I We lost points because the proposed trail does not directly connect to a regional park. <br /> Round Lake Trail <br /> I I met with a representative from the U.S. Fish and Wildlife Service on August 5. We walked the <br /> future trail route in an attempt to identify the approximate location for a trail. I was able to <br /> determine that it would be beneficial to acquire 20 feet property on the east side of their <br /> I development from Welsh as a portion of their park dedication requirement. This 20 feet would <br /> not satisfy their park dedication requirement if the Council decides to follow past practice and <br /> I require 10% for commercial development. I intend to have the trail area surveyed in the fall. It <br /> will be much easier for the survey crew to get their equipment set up once the leaves have fallen <br /> off the trees. <br /> " <br /> I <br /> v <br />