Laserfiche WebLink
<br /> I 'e(~>, <br /> I Through the wetland sequencing and master planning process, the project has been designed to minimize <br /> ,. impacts to the existing wetlands and the Round Lake Wildlife Refuge located to the Northeast. Existing <br /> wetlands located on the Phase II and IV sites will be filled and mitigated according to State and Federal <br /> Regulations. A created wetland on the Phase IV site will fulfill the first half of the 2: I mitigation. <br /> Created uplands and stonnwater ponds on site, as well as created wetlands, uplands, and stonnwater <br /> I ponds on adjacent sites will fulfill the second half of the 2: I mitigation. <br /> Modifications to the original site plan has created eliminated the need for a landscape percentage <br /> I variance on Phase II. The proposed landscape plan provides an average landscaping area of 54% over <br /> the total development and adheres to City requirements with regards to the quantity of caliper inches and <br /> the distribution of size. A significant number of the existing trees have been included within the overall <br /> I landscape plan. Further proposed landscaping will enhance the natural resources of the site and create a <br /> pleasing street wall, which helps to screen the parking area from the adjacent roads. '. <br /> I We have worked in partnership with the City of Arden Hills Park and Recreation Director and the Corps <br /> of Engineers to determine the best alignment of the public trail system easement. The easement runs <br /> adjacent to the boundary along the Round Lake Wildlife Refuge. The overall design of this public trail <br /> I system has been sensitive to the existing trees. <br /> I UTILITIES & GRADING <br /> Watermain <br /> Ie There are two existing watermains on the site. The first, located on the northern portion of properly, is a <br /> 12" watermain. There is also an existing 8" watermain located along the western portion of the property, <br /> . The 12" watermain will be removed from the area east ofthe proposed Round Lake Court. The <br /> remaining portion will be left in place to serve the existing Phase I building. The City is proposing that <br /> a new 12" watennain be constructed in the newly designed Gateway Boulevard right-of-way and that fire <br /> I hydrants be placed along the street at standard intervals. <br /> An 8" line will service each of the three new proposed buildings, connecting them to the watennain in <br /> I the street. Fire hydrants will be located and spaced on each site to meet Fire Marshall requirements. <br /> Sanitary Sewer <br /> I An existing 8" sanitary sewer is located north of the completed Phase I Building. Another 18" sanitary <br /> sewer is currently located south of the existing rail road tracks. <br /> I A new 12" sanitary sewer main will be constructed within the proposed Gateway Boulevard right-of-way <br /> space, Individual 8" sanitary sewer lines, connecting the proposed buildings to the street will service <br /> each of the three new proposed buildings. <br /> I <br /> I <br /> it HKS ASSOCIATES, INC. Page 6 GA TEW A YBUSINESS CENTER <br /> September 17, 1997 for Welsh Development Co., LLC <br /> ~''"'''.".''''.'''''. <br /> . '. . l"""",:"",~.,'l: "'~'_'.')'lf.< H'l<lc <br /> 1(';~'Il<<"_'Il~~r.\'. "'nIl "'P' <br /> I '.111; 1.." I"_\..~l.',;. <br /> , , """'lu:u:-r,,'.' <T:W-(n'~ <br /> -------------- <br />