Laserfiche WebLink
<br /> qlv~ I <br /> . <br /> Storm Sewer I <br /> Generally, the storm water runoff on the-majority of the site flows south-westerly toward 1-35W and .. <br /> 1-694. The remaining portion of storm water runoff flows northerly into Round Lake. Storm water for <br /> the majority of the site will be collected by a new storm sewer system. Storm sewer piping to individual <br /> on-site ponding basins will carry the storm water on each site and to the regional pond southwest of the I <br /> development. Each ponding basin will have a small outlet pipe connected to the City's system within the <br /> proposed Gateway Boulevard right-of-way. <br /> The City is proposing the construction of a new storm sewer system within the proposed Gateway I <br /> Boulevard right-of-way. This new system will carry storm water to a new regional pond as proposed <br /> south of 13th Street (south of the railroad tracks). All new storm sewers and ponding basins are designed I <br /> to meet the requirements of the Rice Creek Watershed District. -- <br /> Gradin!!: I <br /> The proposed earthwork operations will be conducted in order to provide a balanced site. All unsuitable <br /> material will be excavated from the building areas approximately one foot below the proposed pavement I <br /> surface and will be backfilled with suitable material to bring the building pads to grade. In addition, the <br /> paved areas will be test rolled so that "soft spots" may receive further excavation to remove unsuitable <br /> material. Erosion control measures will be placed prior to the start of grading operations and will remain . <br /> in place until all slope stabilization has been completed. <br /> VEHICULAR & PEDESTRIAN CIRCULATION .,t <br /> --, <br /> Pedestrian and vehicular circulation has been safeguarded through the creation of shared truck loading I <br /> facilities, creating a distinct separation from the main parking facilities. The proposed termination of <br /> the existing 14th Street NE as a cul-de-sac, is an integral part of insuring this separation. The proposed <br /> Gateway Boulevard will be realigned to serve as the main access for all three buildings. The proposi::d _ I <br /> Gateway Boulevard right-of-way will follow the southern border of the development and allow for <br /> access to the radio tower east of the site. <br /> The City of Arden Hills is planning to develop a pedestrian trail along Round Lake. Accommodation for I <br /> this public project will be made available through the conservation easements proposed within the <br /> development plan and a dedicated trail easement. I <br /> I <br /> I <br /> I <br /> HKS ASSOCIATES, INC. Page 7 GA TEW A Y BUSINESS CENTER .. <br /> September 17, 1997 for Welsh Development Co., LLC <br /> ~'''''''''''u'''' <br /> 1..'''l'-"(,'''',,,.jl,:JtirU'-rrlil.' <br /> '. 1'''''l,U.~,'lI'.-''I;\C ,""11\'10':_1'''' <br /> l;lt'"""I..,_",,,r. I <br /> .. ' t,)""',,, ,'!I<'" 'H"~I'_:H <br />