Laserfiche WebLink
<br /> EitR",.,.. 0 ''1' I <br /> CITY OF ARDEN HILLS I <br /> MEMORANDUM .. <br /> DATE: September 18, 1997 <br /> TO: Brian Fritsinger, City Administrator J I <br /> FROM: Cindy S. Walsh, Parks and Recreation Director (!; I <br /> SUBJECT: Park Dedication for Welsh Phases II, III, and IV <br /> Back~round - I <br /> Because of the subdivision involved in Phases II, III, and IV of the Welsh development, the I <br /> developer is responsible for fulfilling park dedication requirements according to municipal code; <br /> Section 22-9. Public use dedications detailed under this section of the code states that <br /> dedications for commercial projects should not exceed ten percent. I <br /> Calculation of Park Dedication <br /> Because of the need to obtain property for a 10 foot bituminous trail along Round Lake, I have I <br /> calculated the park dedication for all phases together rather than separately. Through park <br /> dedication, I am hoping to obtain 20 feet of property along the north east property line of Phases <br /> III and IV, which abuts the U. S, Fish and Wildlife Service property, and between the pond and tJ <br /> wetland leading to the cul-de-sac. The attached map highlights the proposed trail area. This <br /> would provide some flexibility in designing the trail so that we are able to avoid the larger oak <br /> trees and wetland areas. The proposed trail provides for an access from 14th street (Gateway I <br /> Boulevard) for trail users in the Gateway Business District. <br /> The current fair market value ofthe property, which is 1,226,350 square feet in size, is I <br /> $1,027,100, Welsh Companies, HKS, and I have calculated the property required to complete <br /> the trail easement as 41,365.65, At a price of$,8375 per square foot, the trail property is valued I <br /> at $34,643.73. <br /> Value of Welsh property $1,027,100 I <br /> Maximum Commercial Park Dedication Requirement XI0% <br /> $ 102,710 <br /> Maximum Park Dedication Value in Cash $ 102,710 I <br /> minus the value of land for trail construction $ 34,643.73 <br /> $ 68,066.27 I <br /> Thus $68,066.27 is the additional cash in lieu of land remaining if Council were to require a <br /> dedication in the amount of 10%, Another option for Welsh to fulfill the 10% park dedication I <br /> requirement is to construct a portion of the trail equal to the $68,066.27 value remaining, If the <br /> City Council wishes to pursue the trail construction as a partial fulfillment of park dedication, I <br /> would work with Welsh Companies to determine the distance of trail that could be constructed, -- <br /> I <br />