My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-22-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 09-22-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:01 PM
Creation date
11/10/2006 4:07:17 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> n <br /> '.''-'<.J ~... ... __..., '-',~ ~... .................,.....'"', '-'- ,.....""'-' ~, ...,"'- ..........;.. ..-''-"..... , .....-, ........ '1 <br /> W <br /> BENSHOOF & ASSOCIATES, INC, qll'u I <br /> TRANSPORTATION ENGINEERS AND PLANNERS 7301 OHMS LANE, SUITE 500 f EDINA, MN 55439 f (612) 832-9858 f FAX (612) 832-9564 -- <br /> August 14, 1997 REFER TO FI~E: 96-53 I <br /> Mr. Kevin Ringwald I <br /> City of Arden Hills <br /> 1450 West Highway 96 I <br /> Arden Hills, MN 55014 <br /> -- <br /> RE: Sequencing oflmprovements 10 Round Lake Road I <br /> . <br /> Dear Mr. Ringwald: <br /> In our telephone conversation of August 5, 1997, you requested that we examine the I <br /> sequence of planned improvements for Round Lake Road relative to the Gateway <br /> Business Center development, and offer our comments. We have completed a basic, brief I <br /> review of the proposed improvement sequence, <br /> Our understanding of the sequence thaI the proposed improvements to Round Lake Road ~ <br /> will follow is; <br /> I. Improvements will be made to 14th Street to provide access to the Gateway I <br /> Business Center development. <br /> 2" The intersection of Round Lake Road and County Highway 96 will be relocated I <br /> easlward aboul 500 feel, At the time of this relocation, the inlersection will be <br /> constructed to provide two approaching northbound lanes and two southbound <br /> departing lanes on Round Lake Road, The four lanes will transition to Iwo lanes I <br /> to malch the existing roadway width of Round Lake Road at a point south of the <br /> "5" -curve that will connect the existing north-south alignment of Round Lake <br /> Road with the new intersection. A temporary traffic signal will be installed at the I <br /> time of this intersection relocation and construction. <br /> 3. Round Lake Road will be widened from its existing two lanes to four lanes south I <br /> of the "S>>-curve to 13th Street nand when future development beyond the <br /> Gateway Business Center requires this widening, <br /> 4" County Highway 96 will be realigned approximately 50 feet north of its presenl I <br /> alignment. Round Lake Road will be extended to reach the new alignment and the <br /> intersection area will be reconstructed. A permanent traffic signal will be installed, I <br /> .. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.