My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-27-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 10-27-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:03 PM
Creation date
11/10/2006 4:07:25 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~}~ .~f"'" , - <br /> Ui(l' I <br />ARDEN HILLS CITY COUNCIL - OCTOBER 14.1997 4 ~ <br /> - <br />Dwayne Stafford, Public Works Superintendent, reviewed the per foot costs for various .... <br />dimensions of piping and estimated that the cost would not be very much more to upgrade from a <br />ten. inch to a twelve-inch watennain. I <br />Mr. Ringwald reviewed the landscape plan which the applicant modified to enhance the north . <br />side of Phases 1II and IV. He pointed out the area directly behind the loading area which is the <br />high area of the site and explained that staff is supportive of the requested landscape changes <br />except for the placement of the casterly two groupings on Phase 111 and the westerly grouping on I <br />Phase IV which staff believes should be relocated north towards the conservation easement. He <br />explained that this relocation towards the hill will bc more effective for screening. <br />Mr, Ringwald reported that the applicant's plan for parking on Phase IV still shows the "proof- I <br />of-parking" within the confines of Pond #5 and the applicant's consultant has not received the <br />necessary approvals for the pond outlet structure from Phase IV, . <br />2. Park Dedication, Welsh <br /> I <br />Ms. Cindy Walsh, Park and Recreation Director, explained the City Council is asked to approve <br />the park dedication often percent which includes the dedication of a twenty-foot wide trail . <br />easement and $50,789.69 remaining cash in lieu, or the easement and the construction of a ten- <br />foot wide trail. These revised figures are based on the conversation held with the Council on <br />September 29, 1997. .. <br />Mayor Probst asked if the trail easement plus cash is being proposed. Ms. Walsh stated this is <br />correct, or the applicant could construct the trail instead of the cash in lieu. I <br />Dick Zehring, Welsh Development Company, stated they are comfortable with this <br />recommendation. I <br />Councilmember Hicks asked if the trail construction will be on the site. Ms. Walsh stated this is <br />correct and would be around the new development area. I <br />Councilmember Hicks asked if this would be a fair comparable financial trade. I <br />Mr. Zehring commented that there may be some cost savings in construction of the trail versus <br />$50,789.69 in cash but it depends on the precise alignment ofthe trail. He stated they are I <br />comfortable with either option. <br />Councilmember Hicks asked if the City would develop the plans and specifications for this trail. I <br />Ms. Walsh stated this is correct and advised that the trail will eventually connect to the City's <br />trail system. <br />MOTION: Malone moved and Hicks seconded a motion to approve a park dedication Welsh I <br /> Companies, Phases 11, Ill, and IV, of ten percent which includes the dedication of -. <br /> a twenty-foot wide trail easement and $50,789.69 cash in lieu, or the easement <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.