My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 07-12-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 07-12-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:10 PM
Creation date
11/10/2006 4:08:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Permit Appliclltion No. 06-036 Amities Construction. Inc. <br /> , <br /> . Erosion & Sediment Control <br /> 4. Revised Grading Plan including construction details of <br /> infiltration feature EOF, revegetation specifications and an <br /> acceptable catch basin inlet protection practice (bales are not <br /> an acceptable practice). <br /> Administmtive <br /> 5. Preliminary Plat providing satisfactory form and description <br /> granting ponding and flowage easements over onsite wetland <br /> and infiltration features. <br /> 6. Draft Declaration for Maintenance of Storrnwatcr Management <br /> Facilities acceptable to District engineer and attorney fOr <br /> proposed onsite storrnwater management features. <br /> 7. Copy of receipt from County Recorder and signed/notarized <br /> legal documcnt(s), Note that legal docurnent(s) are to be <br /> submitted by Applicant to County for recording only after <br /> approval by District <br /> . 8. Copy of MPCA NPDES permit application. <br /> 9. Cash surety in the amount of$I,500. <br /> Exhibits: I. Permit Application dated March 23, 2006. received March 24, 2006. <br /> 2. Wetland Delineation Report prepared by Pioneer Engineering. dated <br /> September 24, 2005, received March 24, 2006. <br /> 3. WCA Notice of Decision for wetland delineation acceptance, dated <br /> December 14, 2005. <br /> 4. Stormwater Management Plan Narrative prepared by Pioneer <br /> Engineering, dated March 23,2006, received March 24,2006. <br /> 5. Hydrologic Calculations prepared by Pioneer Engineering, dated <br /> March 21, 2006, received March 24, 2006. <br /> 6. Infiltration Worksheet prepared by Pioneer Engineering, undated, <br /> received March 24, 2006, <br /> 7. Removal Plan prepared by Pioneer Engineering, dated March 23, <br /> 2006, received March 24. 2006. <br /> . <br /> Emmons & Olivier Resources, Inc, - 2- 4/7/06 <br /> ~~~/~~C'C ~tt~; C~:T- ?:~Z."-~''tc.'\::' <br />
The URL can be used to link to this page
Your browser does not support the video tag.