Laserfiche WebLink
<br /> . Preliminary Plat C> , <br /> The PUD sets the design, density, layout, and setbacks for the proposed development. The <br /> preliminary plat is the legal mechanism to divide the property into smaller paree1s that can be - <br /> individually sold. The preliminary plat is contingent upon approval of the PUD. <br /> Project Overview <br /> The applicant, Royal Oaks Realty, proposes to construct 62,432 square feet of office space on the <br /> former 6.83 acre City Hall and Pub lie Works garage property. The total footprint of the office <br /> would be 41,024 square feet. The office space is proposed to be divided into 23 for-sale condos <br /> in seven separate buildings. The property is proposed to utilize the existing driveway approaeh <br /> from Ramsey County Highway 96 and to construct a new driveway across an existing access <br /> easement to Hamline Avenue. The applicant proposes to share the access road off of HaJJlline <br /> with the daycare that is located at the intersection of Highway 96 and Hamline Avenue. <br /> According to the proposal, the five westernmost buildings Building Overview <br /> (units I-IS) are I-story and 2-story units. The second story Unit Stories Sauare Feet Elevation <br /> on these units is described as a 900 square foot loft. 1 1 1.536 A <br /> 2 2' 2.500 A <br /> The remaining two buildings (units 16-23) would be 2- and 3 1 1.536 A <br /> 3-story walkouts with the walkout side for units 16-18 4 1 2,400 B <br /> facing east and the walkout side of units 19-23 facing south 5 2' 2,500 B <br /> (toward Highway 96). The second floor on unit 17 and the 6 1 2,400 B <br /> tbird floor on units 20 and 22 are 900 square foot lofts. 7 1 1,536 A <br /> 8 2' 2,500 A . <br /> The primary building materials include brick, Hardie Plank 9 1 1,536 A <br /> siding, and glass. The building materials are consistent on 10 1 1,536 A <br /> all four sides of the buildings. The Hardie Plank siding, 11 2' 2,500 A <br /> which is a fiber cement material and would be located 12 1 1.536 A <br /> above the brick, has the appearance of wood. The color for 13 1 2,400 B <br /> the Hardie board has not yet been determined. The units 14 2' 2,500 B <br /> would also have decorative columns, The roofing material 15 1 2,400 B <br /> would be asphalt shingles. 16 2w/o 4,800 C <br /> 17 3w/o* 4,100 C <br /> If approved, the applicant indicated the following proposed 18 2w/o 4,800 c <br /> timeline for the development: 19 2w/o 3,072 D <br /> 20 3w/o* 4,100 D <br /> Fall 2006: Site grading and utility work 21 2w/o 3,072 D <br /> 22 3w/o" 4,100 D <br /> FallJWinter 2006: Begin construction on the three 23 2w/o 3.072 <br /> westerly buildings (units 1-9) D <br /> Total 62.432 <br /> 2008: Project Completed .. Denotes the top floor is a 900 square foot <br /> loft <br /> City of Arden Hills <br /> Planning Commission Meeting for August 2. 2006 <br /> \\Metro-inet.us\ardenhills\Ptanning\Planning Cases\2006\06~023 Royal Oaks PUD & Preliminary Plat (PENDING)\071706 Royal Oaks PUD & . <br /> Preliminary Plat.doc <br /> Page 3 of 24 <br />