Laserfiche WebLink
<br /> ARDEN HILLS PLANNING COMMISSION - AUGUST 2, 2006 <br /> DRAFT 10 <br /> . No parking signs needed on one side of entrance road from Hamline, curve north . <br /> of building 18, and access road north of building 9 and 10. <br /> . Only one fire department key box needed per building. To be placed near F.D.C. <br /> Memorandum from Dan Soler, Ramscy County Public Works, dated July 27, 2006: <br /> "TIle Ramsey County Public Works Department has reviewed thc rcvised site plan for the <br /> Arden Hills Office Park. The County prcviously provided comments to the City <br /> regarding the dcvelopment of this property on May 2 and May 20, 2005. Ramsey County <br /> has thc following comments regarding this development. <br /> L The previously proposed development for this site included 76,000 square feet of <br /> office condominiums. Thc new proposal is for 62,000 square feet of officc <br /> condominiums. The County expects the anticipated trip generation for this site to be <br /> proportionately less than the 868 trips per day cstimatcd in the previous proposal. <br /> 2. Access to the site from the right-inlright-oul driveway on Highway 96 will operate <br /> adequatcly. The County will require the developer to sign and mark the right turn <br /> lane from westbound Highway 96 into the site. <br /> 3, The proposed access on Hamline A venue will be located at thc existing access to the <br /> daycare and the daycare driveway connectcd into this new entrance road. Left turns <br /> exi sting onto Hamline Avenuc III the p.m. peak hour will be problematic. <br /> Northbound Hamline A venue traffic frequently backs up past this entrance. This will . <br /> result in dclay for vehicles exiting the site onto Hamline Avenue. The City may wish <br /> to restrict left turns out of the development at the Ham1ine A venue cntrancc. This <br /> will rcquire drivers wishing to Iravel west on Highway 96 to turn right out of the <br /> Highway 96 access and make a U-turn at Hamline Avenue. This should not be a <br /> prob1enl on a protectcd left turn phase, The right turn in, right turn out and left turn in <br /> at the Hamline Avcnue access point are not anticipated to be a problem. <br /> 4. The County will require adequate radius points on the Hamline A venue access to <br /> allow right turns in and out of the driveway. The radii should be 25 to 30 feet. <br /> 5. The developer will be required to obtain a permit from Ramsey County for work <br /> within the right-of-way. This includes both access points and utility connections. <br /> Thanks for thc opportunity to make comments regarding this issue. If you have any <br /> questions or need any additional information please give me a call at 266-7114." <br /> Chair Sand asked if a second traffic study had been done. Mr. Lehnhoff stated a second <br /> traffic study had bcen prepared. He stated he spoke with the consultant who prepared thc <br /> previous traffic study, and they indicated that the results from the 2005 traffic study <br /> should still be valid. <br /> Commissioncr Bezdicck asked if they had a traffic count that they had going into the <br /> daycare ccntcr. Mr. Lehnhoff responded that might have been in thc original traffic <br /> count, but hc did not have that information separated out. <br /> . <br /> -- DRAFT -- <br />