My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-12-26-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
01-12-26-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 2:11:06 PM
Creation date
2/4/2026 2:03:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT ITEM - 8J <br />r <br />-ARPEN HILLS <br />MEMORANDUM <br />DATE: January 12, 2026 <br />TO: Honorable Mayor and City Councilmembers <br />Jessica Jagoe, City Administrator <br />FROM: David Swearingen, P.E. Public Works Director / City Engineer <br />SUBJECT: Professional Services Agreement for 2026 PMP Street & Utility Improvements <br />Amendment No. 1 <br />Budgeted Amount: Actual Amount: Funding Source: <br />$493,313 $480,968 PIR, Utility Funds, Special <br />Assessments <br />Council Should Consider <br />Motions to approve, table, or deny the following: <br />PSA Amendment No. 1 for the 2026 PMP Street & Utility Improvements project to <br />include the Arden Manor Hardcourt Improvements and Arden Oaks ADA <br />Improvements. <br />Background/Discussion <br />The 2026-2030 Capital Improvement Plan identifies the Arden Manor Hardcourt Improvements <br />and the Arden Oaks ADA Improvements to be constructed in 2026. The 2026-2030 CIP detail <br />sheets are provided as Attachment A & B. These projects already have designed plans and were <br />shelved for future construction. <br />The Arden Manor Hardcourt Improvements will consist of a full reconstruction including <br />subgrade corrections and drainage improvements around the hardcourt. The court striping will <br />consist of basketball and two pickleball courts. <br />The Arden Oaks ADA Improvements will consist of an access ramp from the south side of the <br />park off Arden Oaks Dr. and an 8-ft wide bituminous trail to connect to the play structures. A <br />concrete pad and a metal screening structure will be installed to accommodate an ADA- <br />compliant portable toilet. <br />Page l of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.