My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-12-26-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
01-12-26-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 2:11:06 PM
Creation date
2/4/2026 2:03:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QBOLTON <br />& MENK <br />Real People. Real Solutions. <br />January 5, 2026 <br />David Swearingen, PE <br />Public Works Director/City Engineer <br />City of Arden Hills <br />1245 W Highway 96 <br />Arden Hills, MN 55112 <br />Attachment C <br />ue <br />Burnsville. MN 55337-1649 <br />RE: Professional Engineering for 2026 PMP Street & Utility Improvements Project <br />Amendment 1 - Additional Project Scope <br />Dear David: <br />Ph: (9521 890-0509 <br />Fax: (9521 890-8065 <br />Bolton-Menk.com <br />Through the final design process for the City of Arden Hills' 2026 PMP Street & Utility Improvements <br />Project, the project schedule has been better identified with respect to the City's special assessment and <br />contract award processes. It has been determined that contract award will not occur with sufficient time to <br />execute the contract and allow the contractor to perform tree clearing by the restriction date for tree clearing <br />operations in areas identified as likely to affect specific threatened and endangered wildlife species. As <br />such, it is recommended to proceed with separating the tree clearing operations directly surrounding Karth <br />Lake from the overall project contract and have that work performed in advance of the project to meet the <br />date restriction requirements. <br />Additionally, Arden Hills recently adopted their budget for 2026 which included funds allocated for trail <br />improvements at Arden Oaks Park and for the basketball hardcourt improvements at Arden Manor Park. <br />The trail improvements at Arden Oaks Park were previously designed and included in the bid as a design <br />alternate with the surrounding park improvements project, but it was not approved due to the bid pricing. <br />The basketball court improvements at Arden Manor Park was partially designed with the intent to pursue <br />grant funding, but was not completed and is now proposed to be locally funded. City staff have indicated a <br />desire to incorporate these park improvements into the 2026 PMP Street & Utility Improvements to take <br />advantage of economies of scale that will hopefully result in advantageous bid pricing for the City. Both of <br />these efforts were previously completed by Bolton & Menk parks staff so they can easily be continued and <br />incorporated into the 2026 PMP street & Utility Improvements project with minimal re -work required. <br />If these additional scopes of work are directed by Council to move forward, additional design/plan <br />production services, bidding services, and construction services will be necessary. Below is a list of the <br />proposed changes to the project scope since the original contract was approved to accommodate these <br />requests: <br />Isolate the tree clearing work from the 2026 PMP Street & Utility Improvements plans and <br />specifications, and produce a standalone tree clearing set of plans and specifications. These will <br />be incorporated into a quote package and sent to various tree removal contractors to obtain quotes <br />for the work. The intent would be to have the quote process completed in time to award the tree <br />clearing contract at the February City Council meeting (or the first March City Council meeting <br />at the latest) to allow for the work to be completed by the April date restriction. This work would <br />H:\ARDH\25X137753000\0_2026 PMP Street & Utility Improvements\A_Project Management\2_Contracts\Amendments\Amendment 1 -Tree Clearing Quote Package & Two Parks <br />Project Alternates\137753_2026 PMP Street & Utility Improvements Amendment 1_20260105.docx <br />Bolton & Menk is an eaual 0000rtunitv emolover. <br />
The URL can be used to link to this page
Your browser does not support the video tag.