My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-12-26-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
01-12-26-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 2:11:06 PM
Creation date
2/4/2026 2:03:12 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
only encapsulate tree clearing directly around Karth Lake, primarily for the stormwater pond <br />BMP and the shoreline stabilization/pump system improvements that are proposed to be <br />constructed with the 2026 PMP project. Grubbing of the tree stumps would still be completed <br />with the 2026 PMP project, along with more individual trees that have difficult access issues in <br />accordance with T/E requirements. Conduct additional construction staking and observation <br />services to ensure acceptable performance/cleanup of the tree clearing operations. <br />• Isolate the trail and associated improvements (identified as Alternate 1 at Arden Oaks Park) from <br />the original Arden Hills 2025 Park Improvements plans and specifications, and incorporate them <br />into the 2026 PMP Street & Utility Improvements plans and specifications. Bid these <br />improvements as a design alternate with the 2026 PMP project. Conduct additional construction <br />staking and observation services to ensure acceptable installations of the identified improvements. <br />Complete the final design for the Arden Manor Park Improvements project to develop a final set <br />of plans and specifications. It is assumed that one additional round of city staff review will be <br />required and comments incorporated into the final plans. These plans and specifications will be <br />incorporated into the 2026 PMP Street & Utility Improvements plans and specifications. Bid <br />these improvements as a design alternate with the 2026 PMP project. Conduct additional <br />construction staking and observation services to ensure acceptable installations of the identified <br />improvements. <br />While the City standard process includes an estimated percentage -based method of estimating overhead <br />and contingencies that was included in the feasibility report's project costs, the actual estimated additional <br />final design, bidding administration, and construction services for the potential scope additions are <br />$41,155. If the above identified additional project scope is directed by Council to move forward with the <br />2026 PMP project, these additional fees will encompass the necessary additional final design/plan <br />production, bidding administration, and construction services efforts. <br />The original proposal for the project was in the total amount of $439,813, with the final design task being <br />$96,558, the bidding administration task being $5,992, and the construction services task being $139,751. <br />The potential project scope additions described above would result in an increase to the overall fees that <br />encompasses the scope of work approved on these tasks. We are requesting an amendment for $41,155, if <br />the additional project scope is approved. This would bring the total project fee to $480,968 with the final <br />design task totaling $109,146, the bidding administration task being $7,799, and the construction services <br />task being $166,511. <br />TOTAL PROJECT AMENDMENT FEE = $41,155 <br />We appreciate your trust in us to complete these potential project changes that have been identified over <br />the course of the project process to date. We look forward to completing the final design phase of this <br />project and generating construction documents to bring the final project concept to life for the City of Arden <br />Hills. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Brad Fisher, P.E. <br />Principal Engineer <br />H:\ARDH\25X137753000\0_2026 PMP Street & Utility Improvements\A_Project Management\2_Contracts\Amendments\Amendment 1 -Tree Clearing Quote Package & Two Parks <br />Project Alternates\137753_2026 PMP Street & Utility Improvements Amendment 1_20260105.docx <br />Bolton & Menk is an eaual 0000rtunitv emolover. <br />
The URL can be used to link to this page
Your browser does not support the video tag.