My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-26-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
02-09-26-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 11:22:22 AM
Creation date
2/17/2026 11:17:15 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lastly in review of the proposed building, City Code Section 1325.045 includes additional <br />criteria that would be evaluated as part of the Conditional Use Permit review such as a lighting <br />plan, security plan, and bicycle parking. With the intent of this application only to seek initial <br />feedback from the Council on the proposed concept, the Applicant has not finalized all of these <br />items at this stage in their development planning. The Applicant would be required to submit all <br />of the requirements as referenced in this section as part of a future land use application for a <br />PUD. <br />Based on an initial review, staff believe the proposal could require the following land use <br />requests: <br />• A Comprehensive Plan amendment to address a proposed increase in density and floor <br />area ratio (FAR). <br />o Council should provide comment to the applicants regarding an increase in the <br />Community Mixed Use land use from 20 units/acre to something greater. <br />o Similarly, Council should provide comment to the applicants and staff regarding <br />an increase in the maximum FAR allowed in the Community Mixed Use future <br />land use. <br />• A zoning code amendment to address an increase in the maximum density for the B-2 <br />district and the maximum FAR or a variance from the maximum FAR (0.8). <br />• Conditional Use Permit for Multiple Family Dwelling in the B-2 District <br />• Planned Unit Development <br />The table below provides the performance standards for the B-2 District and the preliminary <br />analysis for the proposed development: <br />B-2 District Standards <br />Roers Companies Proposal <br />Minimum Lot Area per Unit <br />2,178 s.f./unit <br />Approximately 1,562 s.f./ unit <br />Maximum Building Height <br />50 feet <br />Complies <br />Maximum Floor Area Ratio <br />0.8 <br />Approximately 1.2 <br />Maximum Structure Coverage <br />45% of lot area <br />Complies Q1 <br />Minimum Landscape Lot Area <br />20% of lot area <br />Not specified, but not seeking <br />flexibility <br />Maximum PUD Density <br />20 units/acre <br />Seeking approximately 27 units/acre <br />Minimum Front Yard Setback <br />50 feet <br />Complies <br />Minimum Rear Yard Setback <br />20 feet <br />Complies <br />Minimum Side Yard Setback <br />10 feet (min)/20 feet <br />total <br />Complies <br />Off -Street Parking <br />1.1 stall/1 bedroom <br />2 stall/2+ bedroom <br />CUP 1 enclosed/unit <br />221 +/- enclosed <br />142 +/- surface <br />Flexibility not requested <br />Stormwater & Wetlands <br />Based on the existing site conditions, the stormwater retention pond to the northeast side of the <br />proposed development may be able to accommodate the planned development. Additionally, <br />there may be the need to construct an underground retention system due to constraints of the site. <br />At this time, the Applicant has indicated no other details are known on the scope of this work, <br />but as the project progresses they will develop those engineered plans for the City Engineer to <br />review. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.