My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 06-01-2005
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2005
>
PCP 06-01-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:19 PM
Creation date
11/10/2006 4:17:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> " <br /> . <br /> . <br /> The Arden Hills zoning code regulates the "density" of development within a N-B <br /> neighborhood business zone in the three following ways; floor area ratio, lot coverage by <br /> structures, and minimum landscape lot area. The Arden Hills Office Park development <br /> exceeds each of these standards. The floor area ratio is 0.25 (0.7 max.), the building lot <br /> coverage is 15,6% (35% max) and the landscape lot area is 40.2% (35% min). The City's <br /> zoning ordinanee also limits the maximum height ofthe building to 35 feet. The highest <br /> height measurement taken from the lowest grade of a two story walkout building to the <br /> average height between the eaves and the highest ridge of a gable roof is 31 feet. <br /> Upon City approvals, our Company proposes to eomplete all necessary grading, install <br /> utilities and construet all storm water management improvements in the summer months <br /> of 2005. We would then immediately begin the eonstruction of sixteen units or three <br /> buildings which would not be completed for occupancy until late winter or spring 2006. <br /> The remaining 14 units, four buildings, would be constructed in the summer of2006. <br /> The use of the PUD ordinanee allows our Company to propose a single development plan <br /> for the existing six separate parcels of land, The Arden Hills Office Park plan will <br /> conform to the spirit and intent of the Neighborhood Business zone. Minor modifications <br /> to the N - B zoning include a reduced parking lot setback of 16.1 feet (20 ft. required) <br /> . along Highway 96. It is noted that there is also approximately another 45 feet of distance <br /> to the curb line of Highway 96. Hence, the parking lot curb will be 61 feet from the.curb <br /> line of Highway 96. A second modification from the N-B standards is being requested for <br /> signage. We are proposing a free standing sign of 120 sq. ft. identifying the Arden Hills <br /> Office Park. The N-B zone restricts a free standing sign to 60 square feet. We helieve this <br /> modification is justified because the site now includes six separate parcels of land which <br /> could each have free standing signs. This sign has also heen carefully designed to match <br /> the style and materials of the office buildings. We do agree to limit each of the thirty <br /> units to 30 sq. ft. of wall signage. The free standing sign and proposed typical wall signs <br /> are shown with the building elevations. <br /> The exterior of the buildings will be constructed mainly of the following materials; glass <br /> windows, brick (on all four sides), stuceo on the upper gable roof ends, and wood <br /> pillars/columns. Roof material will be a fiberglass shingle. Earth tone colors will be used. <br /> The overall intent of the architectural design is to give the appearance of residential <br /> "townhouse" look to the offiees. Our Company has been involved in the planning and/or <br /> eonstruction of similar developments in the Cities of Little Canada, Vadnais Heights, <br /> Stillwater, Eden Prairie, and Lakeville. Like other sites, this is an excellent "transition" <br /> land use for vacant land along highly traveled roads like Highway 96 and nearby adjacent <br /> residential properties. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.