Laserfiche WebLink
<br /> Arden Hills Parks, Trails and Recreation Committee Meeting Minutes <br /> September 23, 2003 <br /> Page 8 of 11 <br /> . structure at Tony Schmidt Park and reviewed the building design with the Committee. He <br /> encouraged the Committee to tour Cummings Park adding that they were told earlier today that <br /> three pine trees would have to be removed to accommodate the structure. He stated that they <br /> have agreed to bring in a tluee-inch water main off the Wincrest Cul-de-sac that would provide a <br /> three-inch line that would supply all water to the building and allow the City to run an irrigation <br /> system into the two soccer fields. He stated that all controls would be located in the building. <br /> Ms. Olson reviewed the final plans with the Committee stating that she would provide the <br /> Committee with full copies of the plan for their review at a later date. She stated that very little <br /> has changed since September 18, 2002 noting that the City has been assured that the structure <br /> would be built according to their specs. She further stated that she has been assured by Dave <br /> Reimer at Guidant Corp. that if there is anything that the City does not like on the building that it <br /> would be addressed and taken care of promptly. She stated that it would be a tremendous <br /> building with all of the amenities that the City has wanted. She reviewed the play structure area, <br /> the hockey and the soccer areas with the Committee noting that it would also be a great location <br /> for the band shell. <br /> Committee Member Henry clarified that the design that was most recently reviewed was at a <br /> proposed cost of $450,000 and that it is now $350,000 and asked what if anything was lost. Ms. <br /> Olson clarified the differences noting that the cost actually did not go down, based on the original <br /> . design. She reviewed the design changes and grading issues with the Committee stating that they <br /> have not been given the final price on the newest design. She stated that they are moving <br /> forward because Guidant has said it needs to get done. <br /> Mr. Moore clarified that the inside and layout of the building has not changed at all. He <br /> explained that the issues were exaggerated a bit due to the grading issues, the placement of the <br /> building on a hill and the trail connections. Ms. Olson agreed stating that the original plan works <br /> better with the flmction of the park adding that it is a better looking building that would be more <br /> useable based on the area and location. <br /> Committee Member Thompson noted that the kitchen area has changed and asked for <br /> c1ari fication. Mr. Moore clarified that there would not be a kitchen prep area and that only a sink <br /> would be included. <br /> Ms. Olson stated that there is a possibility that they could put the hockey rink back into the <br /> original design and reviewed with the Committee. She further stated that there is a possibility <br /> that they could install a pleasure rink that could be utilized year round and reviewed with the <br /> Committee. She stated that this would be explored further once the building is in place and they <br /> can determine the grading issues. Mr. Moore stated that it is possible that they might not have an <br /> ice area this year due to the construction and reviewed with the Committee. <br /> . Chair Straumann asked if they were working on any roads entering Cummings Park. Mr. Moore <br /> clarified that they are not as it is not a City road. He explained that the road entering the park <br /> belongs to Fair Isaacs and reviewed with the Committee. He stated that they could discuss the <br />