Laserfiche WebLink
16 <br />The map below outlines all play structures citywide. <br />Park Building Maintenance –640 FTE Labor Hours estimated; 2 FTEs required High Priority. <br />Monthly inspections, and project details below. <br />x Cummings Pavilion <br />o Pavilion full roof replacement spring 2025. <br />o Pressure wash concrete patio, sidewalks, picnic tables, and exterior of the building. <br />o Replace furnace and water fountain filters. <br />o Contract to clean HVAC duct system. <br />o Sanitize and deodorize interior rubber flooring. <br />x Perry Pavilion <br />o Pressure wash concrete patio/ sidewalks, picnic tables, and exterior of the building. <br />o Paint walls in the restrooms and kitchen. <br />o Open the building and turn on plumbing in the spring. Winterize plumbing in the fall. <br />x Perry Warming House <br />o Inspect roof. (Full roof replacement in 2025) <br />o Sanitize and deodorize interior rubber flooring. <br />x Freeway Warming House <br />o Roof inspection, complete as-needed roof repairs. <br />o Pressure wash exterior. <br />o Paint exterior.