Laserfiche WebLink
17 <br />o Spot replacement of the siding, soffits, fascia and paint exterior. <br />o Sanitize and deodorize interior rubber flooring. <br />The list below are parks with rain shelters. Rain shelters will be inspected annually,and inspection <br />results will be tracked for preventative maintenance and annual budgeting/planning. <br />x Arden Manor Park <br />x Royal Hills Park <br />x Floral Park <br />x Cummings Park <br />x Hazelnut Park <br />x Ingerson Park <br />x Johanna Marsh <br />Hard Court Maintenance 120 FTE Labor Hours estimated; 2 FTEs required Medium Priority. <br />For each location below: <br />x Cummings Park, double tennis court and attached basketball court. Last resurfaced- 2020 <br />o Install tennis nets, remove debris, crack fill courts (contractor). <br />x Arden Manor Park, basketball court <br />o Reconstruction potentially in 2026 <br />o Add a “rules and park hours sign” at the Arden Manor Park Basketball Court at the <br />request of the Arden Manor Homes Manager. <br />o Finish the ga-ga ball pit by cutting in the angles entrance. <br />x Royal Park, tennis and basketball court. Reconstructed in 2020 <br />o Install tennis nets, remove debris, crack fill (contractor). <br />o Extend the existing court drainage to the west. <br />x Floral Park, tennis and basketball court <br />o Install tennis nets, remove debris <br />x Hazelnut Park, tennis and basketball court <br />o Install tennis nets, remove debris <br />o Scheduled for 2025 pavement rehabilitation <br />o Repair a washout along the north side of the court and stabilize. <br />x Arden Oaks, basketball court <br />o Resurface/contracted park project in 2025. <br />x Freeway Park, basketball court <br />o Resurface/contracted park project in 2025. <br />x Ingerson Park, basketball court (last cracked filled in 2018) <br />o Pressure wash and crack fill court (contractor) Assess the condition, this park is <br />scheduled for a rehab project in 2027.