My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-26 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2026
>
02-17-26 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 5:00:52 PM
Creation date
3/10/2026 4:59:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />Perry Dog Park Water Source Project (PTRC recommendation from 2022)80 FTE labor hours required; <br />2 FTEs required Low Priority. <br />An improvement to the Perry Dog Park can be made, if time allows, to tap-off of the existing irrigation <br />system to supply a water source for public use while the dog park is open. <br />Potential Volunteer projects: <br />x Park bench cleaning <br />x Buckthorn removal, small plant pulling. <br />x Install sealer on gaga ball pits. Hazelnut, Cummings, Arden Manor, Floral. <br />x CNP natural wood chip installation on trails, continued from chips installed in 2024. <br />x Weed/ replant as needed gardens at Johanna Marsh Park and Perry Park sign. <br />x Weed play structure mulch <br />x Fill holes at Perry Dog Park. This should be assessed prior to being assigned to a volunteer <br />group. <br />Citywide Municipal Trail Inspections 40 FTE Labor Hours estimated; 1 FTEs required Medium Priority. – <br />Is there an update on this that I’m not aware of from 2025? <br />In 2024 Public Works completed half of the trail system, in 2025 PW will inspect the remainder of the <br />trails system and update the condition ratings to assist in planning for maintenance repairs and <br />rehabilitation schedule. <br />Citywide Bench Inspection 60 FTE Labor Hours estimated; 1 FTEs required Low Priority. <br />Bench inventory and map need to be updated. Once created, determine inspection cycle for each bench. <br />Identify “advertisement type” benches, those should be inspected annually. <br />Assistance with the Parks Master Plan as needed 40 FTE Labor Hours required; 1 FTEs required <br />Medium Priority. <br />x Update/revise Parks Maintenance Policy to set standards and expectations of service reflected <br />in the Parks Master Plan <br />x Are there any additional needs from PW in 2026? <br />Miscellaneous Carryover Projects from 2025 <br />x A proposal was made in the 2024 PWWP to tap off the irrigation for a water source at the Perry <br />Dog Park. This item will be added to the 2025 PWWP to be completed as time allows. <br />x Continue efforts to add a drain tile system to the ball field at Floral Park which will discharge <br />water into the newly installed 2024 PMP drainage system. <br />x Buckthorn removal continued to be an ongoing effort for volunteers and the Institution <br />Community Work Crews (ICWC) crew as time allowed. There was more progress made in the <br />Chatham Open Space and Cummings Park areas in 2024, but more work will continue as time <br />and resources are available.
The URL can be used to link to this page
Your browser does not support the video tag.