My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-26 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2026
>
02-17-26 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 5:00:52 PM
Creation date
3/10/2026 4:59:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Pleasure and Hockey Rink Maintenance 1,920 FTE Labor Hours estimated; 3 FTEs required High <br />Priority. <br />This work typically begins in November to build ice, with the goal of having a solid ice base in time for <br />the holiday season. Prior to establishing ice, PW staff completes the below items to prepare for skating <br />season. <br />x Coordinate temporary warming house delivery and electrical connection to Hazelnut skating <br />rink. <br />x Inspects, cleans, and delivers needed supplies to the warming houses. <br />x Inspect and repair rink lighting, damaged hockey boards, back stops, and grade inside the rink if <br />needed. <br />Once ice is established, PW cleans and floods the ice daily, Monday – Friday. PW coordinates with the <br />Recreation Manager to ensure the warming houses are staffed with attendants during rink hours. <br />**Purchase replacement hockey goals for Perry and Hazelnut rinks in 2026. <br />Hockey rink safety fencing maintenance is needed at the below parks. 60 FTE Labor Hours estimated; <br />2 FTEs required Medium Priority <br />x Freeway Park safety fencing and wood structure to be replaced. The posts are rotted and at the <br />end of useful life. <br />x Hazelnut Park chain link safety fence needs the chain link replaced. <br />x Perry Park chain link safety fencing needs the chain link replaced. <br />Hazelnut Park Sledding Hill 20 FTE Labor Hours estimated; 2 FTEs required Medium Priority. <br />Added in 2023, Public Works will continue to maintain this space for sledding activities in the winter <br />months. Maintenance includes brush/tall grass cutting and removal of woody vegetation. This <br />maintenance will be completed by October 31st. <br />Ingerson Park and Sampson Park (scheduled for a rehab project in 2027) 15 FTE Labor Hours <br />estimated; 1 FTEs required High Priority. <br />Assist with the design phase of the project in 2026. <br />Install remaining amenities left over form the 2025 Park Improvement Project 80 FTE labor hours <br />required; 2 FTEs required Low Priority. <br />Coordinate with the Assistant PW Director specific amenities and location within Freeway and Arden <br />Oaks Parks. <br />PTRC-Inspired Projects: <br />To be added by March
The URL can be used to link to this page
Your browser does not support the video tag.