My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-26 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2026
>
02-17-26 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 5:00:52 PM
Creation date
3/10/2026 4:59:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Snow Plowing Operations for Trails 320 FTE labor hours estimated per event; 2 FTEs required; high <br />priority. <br />The map, shown below, is for snowplow Route 4 which includes park system trails and street-side <br />sidewalks. The operators for this route also plow and salt the City Hall parking lot and sidewalks. When a <br />full citywide plow event takes place, Route 4 is completed alongside the street routes when Public <br />Works is fully staffed. <br />PW Staff need to plow/ clean-up street side sidewalks 1-3 times following a snow event of 2” or more <br />(during normal working hours). This is primarily due to Ramsey County snow removal operations and <br />their priority to public safety along county roads. <br />Note – With the addition of new trail segments, the timeframe for trail snow removal may be longer <br />with our current resources.
The URL can be used to link to this page
Your browser does not support the video tag.