My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-26 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2026
>
02-17-26 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 5:00:52 PM
Creation date
3/10/2026 4:59:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />x Repair the damaged turf and level as needed. During 2025, PW saw damage caused by dogs <br />digging within the dog park. PW will make an effort to repair the damage a minimum of two <br />times per year. This repair will consist of topsoil leveling, seeding, and installing temporary <br />fencing as needed until turf can reestablish. <br />ĞŶĐŚ/ŶƐƚĂůůĂƟŽŶĂƚŝƚLJ,Ăůů 40 FTE Labor Hours required; 2 FTEs required High priority. <br />dŚĞƌĞĂƌĞϯŶĞǁďĞŶĐŚĞƐƚŽďĞŝŶƐƚĂůůĞĚŽŶŝƚLJ,ĂůůƉƌŽƉĞƌƚLJ͘WtǁŝůůƵƐĞŽƵƌƐƚĂŶĚĂƌĚŝŶƐƚĂůůĂƟŽŶ <br />ƉƌŽĐĞƐƐĨŽƌϮŽĨƚŚĞďĞŶĐŚĞƐĂŶĚƚŚĞƚŚŝƌĚďĞŶĐŚǁŝůůďĞƉŽƌƚĂďůĞŽŶƚŚĞůŽǁĞƌůĞǀĞůƉĂƟŽ͘ĞůŽǁĂƌĞ <br />ŐĞŶĞƌĂůůŽĐĂƟŽŶƐĨŽƌƚŚĞďĞŶĐŚĞƐƚŽďĞŝŶƐƚĂůůĞĚ͘ <br />Weed Control, Aeration and Fertilization 180 FTE Labor Hours required; 2 FTEs required High priority. <br />These types of landscape maintenance are completed at the City-owned property locations shown on <br />the map below. PW staff complete that work throughout the city, annually, using a concentrated liquid <br />herbicide and a slow-release granular fertilizer. This project is typically completed in early summer and <br />again in late summer.
The URL can be used to link to this page
Your browser does not support the video tag.