Laserfiche WebLink
9 <br />x Repair the damaged turf and level as needed. During 2025, PW saw damage caused by dogs <br />digging within the dog park. PW will make an effort to repair the damage a minimum of two <br />times per year. This repair will consist of topsoil leveling, seeding, and installing temporary <br />fencing as needed until turf can reestablish. <br />ĞŶĐŚ/ŶƐƚĂůůĂƟŽŶĂƚŝƚLJ,Ăůů 40 FTE Labor Hours required; 2 FTEs required High priority. <br />dŚĞƌĞĂƌĞϯŶĞǁďĞŶĐŚĞƐƚŽďĞŝŶƐƚĂůůĞĚŽŶŝƚLJ,ĂůůƉƌŽƉĞƌƚLJ͘WtǁŝůůƵƐĞŽƵƌƐƚĂŶĚĂƌĚŝŶƐƚĂůůĂƟŽŶ <br />ƉƌŽĐĞƐƐĨŽƌϮŽĨƚŚĞďĞŶĐŚĞƐĂŶĚƚŚĞƚŚŝƌĚďĞŶĐŚǁŝůůďĞƉŽƌƚĂďůĞŽŶƚŚĞůŽǁĞƌůĞǀĞůƉĂƟŽ͘ĞůŽǁĂƌĞ <br />ŐĞŶĞƌĂůůŽĐĂƟŽŶƐĨŽƌƚŚĞďĞŶĐŚĞƐƚŽďĞŝŶƐƚĂůůĞĚ͘ <br />Weed Control, Aeration and Fertilization 180 FTE Labor Hours required; 2 FTEs required High priority. <br />These types of landscape maintenance are completed at the City-owned property locations shown on <br />the map below. PW staff complete that work throughout the city, annually, using a concentrated liquid <br />herbicide and a slow-release granular fertilizer. This project is typically completed in early summer and <br />again in late summer.