My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-17-26 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2026
>
02-17-26 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 5:00:52 PM
Creation date
3/10/2026 4:59:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />games, is completed by SPT Staff. The park locations and number of fields are listed below. Ongoing <br />maintenance and field prep, per the recreations schedule, continues throughout spring, summer, and <br />fall. <br />x Cummings Park (1 field) <br />x Royal Park (1 field) <br />x Floral Park (1 field) <br />x Perry Park (3 fields) <br />x Hazelnut Park (1 field) <br />Socccer Field Leveling and Turf Maintenance. XX FTE labor hours required; X FTEs required high <br />priority. <br />x As a larger turf maintenance project for 2026 – dethatch, broadcast sand/ organic mix, grade, <br />and seed within the soccer field playing surfaces. This is in addition to aerate and fertilizer <br />applications. The goal of this project is to restore the turn to a healthy state. <br />x Turf repair and topsoil leveling is needed at Cummings Park and Hazelnut Park soccer fields. <br />Work with the Recreation Programmer to coordinate scheduling. <br />Athletic Field Striping and Setup 180 FTE labor hours required; 1 FTEs required high priority. <br />Field striping and setup is completed for soccer and softball fields at the parks listed below throughout <br />the spring, summer, and fall. This work includes the initial field layout and soccer goal setup completed <br />by FTE’s. <br />x Royal Park (foul lines)- discontinued per the Recreation Coordinator. <br />x Cummings Park (baseball foul lines, 2 adult soccer fields, 1 youth soccer field) <br />x Floral Park (foul lines) - discontinued per the Recreation Coordinator. <br />x Perry Parks (foul lines, 3 fields) <br />x Hazelnut Park ( 2 adult soccer fields) <br />x Valentine Hills Elementary (running track) - discontinued per the Recreation Coordinator. <br />Floral Park Ball Field Drain Tile Improvements 10 FTE labor hours required; 1 FTEs required Low <br />priority. <br />Carryover form 2025 <br />Create a plan for installation and determine budget amount to be considered for the 2026 budget. <br />***Note, this needs to be determined by July 31st.*** <br />Perry Dog Park Turf Maintenance. XX FTE labor hours required; 2 FTEs required Low priority.
The URL can be used to link to this page
Your browser does not support the video tag.