Laserfiche WebLink
12 <br />Add specific location for 2026- <br />Ingerson, Sampson are scheduled for rehab in 2027. <br />All stumps located in green/mowed spaces will be ground and restored. A tree contractor will remove <br />trees larger than 12” in diameter. <br />Tree Replanting Plan: 60 FTE Labor Hours estimated; 2 FTEs required Medium Priority. <br />x Design and execute a tree planting plan for the area south of the hockey rink at Freeway Park. <br />Large trees were removed in 2025 as part of the park rehab project. <br />x Plant 1 tree at Arden Oaks Park. Coordinate the location and tree species to plant with the Parks <br />Manager. <br />Carryover from 2025. Updates on a planting plan? <br />Text from 2025 PWMP- <br />x Hazard trees to be removed in 2025 are substantial. The replanting plan will be developed in <br />2025 for planting in 2026. Floral and Hazelnut parks are undergoing a large-scale reforestation <br />project removing buckthorn. PW and Great River Greening will need to evaluate locations of <br />new trees, species, and cost to the city. *** Note-a quote and new tree location map will be <br />completed by June 1st for budgeting and planning. *** <br />x A tree planting plan for Arden Oaks and Freeway Parks to be developed in 2025 for planting in <br />the fall of 2025. <br />Cummings Park south native planting project. XX FTE Labor Hours estimated; X FTEs required Low <br />Priority. <br />As time allows prep and seed for a native planting project within the area shown below on the map. This <br />project will assist in keeping invasive plants and buckthorn down. This can be completed in 3 phases. <br />x 1/3 in 2026 <br />x 1/3 in 2027 <br />x 1/3 in 2028