Laserfiche WebLink
<br />City of Arden Hills, MN – 25X.137753 LIFT STATION CONTROL SYSTEM <br />January 2026 PAGE 26 90 04-24 <br />©2026 Design Tree Engineering, Inc All Rights Reserved <br />5. Signal types and levels. <br />6. Interface devices where required. <br />7. Operating environment conditions. <br />8. All other aspects of field devices impacting on the design of the system. <br />H. All spare and unused I/O shall be wired to terminal strips. This wiring shall include all auxiliary devices <br />and components to complete the installation (e.g., interposing relays, wireways). <br />I. It shall be the responsibility of Contractor to include all the inputs and outputs required to maintain <br />existing functionality and to meet all aspects of this specification, regardless of whether they are <br />specifically included in the I/O listing in this specification. <br /> SCADA SYSTEM PROGRAMMING <br />A. Provide all programming, wiring, and hardware modifications to transmit, receive, display, trend, <br />report, alarm, and handle the data. <br />B. Programming shall include but not be limited to <br />1. Local PLC <br />2. Local OIT <br />3. All other sites which may need programming modifications to integrate new lift station. <br />C. A copy of the complete PLC program shall be saved on the respective PLC memory card. <br />D. The PLC’s shall be programmed to retain setpoint and other critical data so that the PLC will <br />automatically resume the process controls when power is restored to the panel after a power failure. <br />E. SCADA system shall be designed and programmed to operate without the use of either the SCADA PC or <br />HMI. Meaning, programming, data processing, control loops, algorithms and other programming <br />features shall reside on the PLC. If the SCADA PC or HMI is off or not operating, the control system shall <br />still operate as specified. <br />F. Screens shall be programmed to display each process, monitoring point, and setpoint for the Lift <br />Station. Graphics shall be designed in such a manner to symbolize in 2D of the actual process and <br />equipment being controlled. Screens with text buttons and text indicators only will not be allowed. <br />G. Screen background shall be a solid color, other graphics in the background will not be accepted. <br />H. Display the call, run, fail, position and other status points of each piece of equipment and alarms for the <br />associated equipment. <br />I. Screen(s) shall allow the operator to adjust all variables and view real-time data associated with the <br />process control and equipment. <br />J. Screens(s) shall display alarms and allow the operator to acknowledge the alarms at any location. <br />K. Provide screens required for the system operations as specified in Contract Documents. <br />L. Systems integrator shall expect approximately 8 additional hours of coordinating screen layouts and <br />display options with the Owner. Systems integrator shall make programming changes to the screens as <br />requested by the Owner/Engineer, at no additional cost to the Owner. <br />1. Contractor to schedule this meeting with the Owner Representative no less than one week prior to <br />the meeting. <br />2. A copy of all screen shall be provided to the owner no less than one week prior to the meeting to <br />allow adequate time to review. <br />