My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-05-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 01-05-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:29 PM
Creation date
11/10/2006 4:47:27 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JHtl-02-1998 10:36 BPI,..) 61';: 370 1378 P.0~/OS <br />Mr, Brian Fritsinger <br />DecembeT 30, 1997 . <br />Page 2 <br /> C. Each layout will include a summary of "Pros" and "Cons" for <br /> companson purposes, <br /> D, Each layout will include a summary of traffic movements and level <br /> of service for ramp intersections on CSAH 96 as applicable, <br /> E. Each layout will include consideration for pedestrian movements~ <br /> f, Each layout will include a summary of property impacts resulting <br /> from the proposed roadway construction~ <br /> G~ Each layout will include consideration for current and future access <br /> implications for the TCAAP site~ <br /> 4. Review existing accesses onto TH 10 between CSAH 96 and 1-3SW and <br /> make recommendations for improvements as applicable. <br /> 5, Summarize the current planned Tedevelopment of the TCAAP site (per latest <br /> City Comprehensive Plan) and Teview the current planned accesses to the site <br /> and how they conform to the alternative interchange layouts at TH 10 and <br /> CSAH 96~ <br /> 6, BRW will attend meetings as necessary to present the results of the study, <br /> It is assumed that two meetings will be necessary, one meeting with city staff <br /> and one meeting with City Council membeTs, The meetings will be attended <br /> by Greg Brown and the transportation engineer directing the study, . <br /> ESTIMATED COSTS <br /> We propose that the basic services identified above be completed on an hourly-not- <br /> to-exceed basis consistent with the terms of our Professional Services Agreement. <br /> The following is a summary of our estimated fees for the project: <br /> TransnortationlTraffic Study <br /> Senior TTansportation Engineer 16 Hours @ $125,00 $ 2,000.00 <br /> City Engineer 24 Hours @ $80.00 $ 1,920~00 <br /> Traffic Engineer 60 Hours @ $70,00 $ 4,200,00 <br /> Technician 60 Hours@ $60.00 $ 3,600.00 <br /> Clerical 10 Hours@ $30,00 $ 300.00 <br /> Subtotal $ 12,020.00 <br /> Direct Expenses <br /> Direct Expenses fOT the project include items such as mileage, parking, photography, <br /> printing and delivery services etc. BR W will bill all expenses incurred on the project <br /> directly to the City with no BRW markup. The total estimated amount for expenses <br /> is $250,00, <br /> . <br /> ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.