My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-13-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 10-13-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:32 PM
Creation date
11/10/2006 4:47:49 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br />. in the Gateway Business District. The current city public works director and city cngineer <br /> concur with this recommendation from the 1990 plan. <br /> Storm Drainare Improvements <br /> Proposed storm drainage improvements include the construction of catch basins and storm <br /> sewer under the permanent roadway section and catch basins for the commercial driveway <br /> entrances. Storm sewer trunk lines will connect to an existing 36 inch diameter stub located <br /> at Gateway Boulevard. Storm water quality ponding will be provided by the existing pond <br /> located south of the Minnesota Commercial railroad tracks and the proposed pond to be <br /> constructed in the southeast quadrant of the Indykiewicz property as a part of phase one of <br /> the West Round Lake Road reconstruction. The storm drainage system would collect runoff <br /> from approximately 780 meters (2,600 ft) of West Round Lake Road and portions of the <br /> commercial properties to the east. <br />. <br />. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.