Laserfiche WebLink
<br /> " w <br /> SRW Copy <br /> City Copy <br /> Contractor Copy <br /> V m.pector Copy <br /> . CITY OF ARDEN HILLS <br /> CONTRACT CHANGE ORDER <br /> Project: 1998 Street Reconstmction and Maintenance Improvements <br /> Change Order Number: 1 (One) <br /> Date: October 13, 1998 <br /> Contractor: T.A. Schifsky and Sons, Inc. <br /> The additions, revisions and corrections contained herein shall be made to the contract documents for the <br /> project and shall become a part of the Scope of Work. <br /> Description of Changes: <br /> A. The contract shall be modified to include the milling and removal of additional bituminous pavement <br /> and additional bituminous wear course quantities. <br /> After the original pavement was initially milled the remaining pavement was determined to be to <br /> brittle and thin in several areas, which would significantly reduce the effective life span of the <br /> proposed overlay. With the concurrence of the City Staff it was determined to mill the remaining <br /> . pavement and pave with a 75mm (3inches) wear course of bituminous pavement. The overlay <br /> thickness was 50 mm (2 inches) therefore the change order represents an increase of 25 mm (1 inch) <br /> of bituminous pavement. <br /> Incorporating the additional milling and paving work into the contract will result in an increase in <br /> the contract amount as follows: <br /> BID SCHEDULE I - SANDEEN OVERLAY <br /> Seq. No.1 Original Quantity Amount <br /> MnlDOT Unit Contract Increase/ Add! <br /> No. Item Unit Price Quantity (Decrease) (Deduct) <br /> 9/ Type 4\ Wearing <br /> 2104.523 Course Mixture t S 27.40 250.00 198.00 S 5,425.20 <br /> 19/ Mill and Reclaim <br /> 2232.501 Bituminous Pavement m2 S 2.50 0.00 2071.00 S 5,177.50 <br /> . Net Contract Add S 1 0,602.70 <br /> COl-2 <br />