Laserfiche WebLink
<br /> , <br /> '. ESTIMATE OF QUANTITIES AND COSTS <br /> THE ELIMINATION OF <br /> , SANITARY SEWER LIFT STATION #11 <br /> , GRAVITY SANITARY SEWER CONSTRUCTION <br /> ALTERNATIVE B <br /> , Contract Unit Total <br /> Seq. No. Item Unit Quantity Price Amount <br /> , 1 Mobilization LS 1.00 15,000.00 15,000.00 <br /> , 2 Remove Sanitary Sewer Pipe LF 200.00 5.00 1,000.00 <br /> 0 Abandon Sanitary Sewer Pipe LF 650.00 1.50 975.00 <br /> J <br /> I 4 Remove Lift Station LS 1.00 5,000.00 5,000.00 <br /> , 5 Remove Sanitary Manhole EA 3.00 500.00 1,500.00 <br /> ,e 6 Sanitary Sewer Manhole EA 12.00 2,000.00 24,000.00 <br /> 7 Extra Depth Manhole LF 168.00 150.00 25,200.00 <br /> , 8 10" PVC Sanitary Sewer Pipe LF 4,100.00 60.00 246,000.0 <br /> , 9 8" PVC Sanitary Sewer Pipe LF 650.00 45.00 29,250.00 <br /> , 10 Connect to Existing Sanitary EA 2.00 500.00 1,000.00 <br /> Sewer <br /> , 11 Steel Pipe Casing LF 120.00 40.00 4,800.00 <br /> , Subtotal 353,725.00 <br /> 10% Contingencies 35,400.00 <br /> , Total Estimated Construction Cost 389,125.00 <br /> , <br /> ,- <br /> , <br />