Laserfiche WebLink
<br /> . <br /> .. ESTIMATE OF QUANTITIES AND COSTS <br /> THE ELIMINATION OF <br /> . SANIT ARY SEWER LIFT STATION #11 <br /> GRAVITY SANITARY SEWER CONSTRUCTION <br /> . ALTERNATIVE C <br /> . Contract Unit Total <br /> Seq. No. Item Unit Quantity Price Amount <br /> . 1 Mobilization LS 1.00 15,000.00 15,000.00 <br /> 2 Remove Sanitary Sewer Pipe LF 800.00 5.00 4,000.00 <br /> . 3 Abandon Sanitary Sewer Pipe LF 1,800.00 1.50 2,700.00 <br /> . 4 Remove Lift Station LS 1.00 5,000.00 5,000.00 <br /> 5 Remove Sanitary Manhole EA 6.00 500.00 3,000.00 <br /> . 6 Sanitary Sewer Manhole EA 13.00 2,000.00 26,000.00 <br /> .. 7 Extra Depth Manhole LF 162.00 150.00 24,300.00 <br /> 8 10" PVC Sanitary Sewer Pipe LF 3,700.00 65.00 240,500.0 <br /> . <br /> 9 Connect to Existing Service EA 5.00 2,000.00 10,000.00 <br /> I Pipe <br /> 10 Connect to Existing Sanitary EA 2.00 500.00 1,000.00 <br /> . Sewer <br /> 11 Steel Pipe Casing LF 120.00 40.00 4,800.00 <br /> . 12 Erosion Control and LS 1.00 17,000.00 17,000.00 <br /> Restoration <br /> . 13 Clearing and Grubbing AC 2.00 2,500.00 5.000.00 <br /> . Subtotal $358,300.00 <br /> . 10% Contingencies $35,800.00 <br /> .. Total Construction Cost $394,100.00 <br /> . <br />