Laserfiche WebLink
<br /> CITY OF ARDEN HILLS <br /> . MEMORANDUM <br /> DATE: February 4, 1998 <br /> TO: Brian Fritsinger, City Administrator <br /> FROM: Dwayne Stafford, Public Works Director <br /> SUBJECT: 1998 Street Improvements <br /> Background <br /> On December 8, 1997, the Arden Hills City Council approved Resolution #97-59, Authorizing <br /> the Preparation of Detailed Plans and Specitications for the Proposed 1998 Street Improvement <br /> Project. Council also directed Staff to review the recommendation made by the Public Works <br /> Director to do a bituminous overlay of Glen paul Avenue. <br /> Plans and Specifications <br /> The Public Works Director has reviewed and approved the plans and specifications with the City <br /> Engineer suggesting only minor changes. Council may note that, included in the plans is the <br /> replacement of a culvert on Hamline A venue and Ingerson Road, and the relocation of a fire <br /> hydrant between Carroll's Furniture and the Holiday Inn on County Road E. <br /> . G1cnpaul Rcvicw <br /> BR W has taken soil samples below the pavement on G1enpaul A venue in several areas. Analysis <br /> of these samples indicate little; if any, road base material (Class 5) exists below the blacktop, and <br /> soil conditions are less than adequate to support an overlay and assure a desirable longevity. <br /> Council may note that Glenpaul Avenue was not included in the plans, as the City Engineer and <br /> Public Works Director felt Council should be aware of these findings before proceeding further <br /> on G1enpaul. <br /> Stowe Avenue <br /> The Public Works Director had earlier informed Council that the sewer main servicing the Stowe <br /> A venue residents had a history of problems. It was the Director's understanding that this line <br /> would be televised and evaluated to determine if a new line should be installed on Stowe Avenue <br /> as part of reconstruction. This line has been televised and has been determined to be in good <br /> condition except for some minor repair needs. <br /> Recommendation <br /> The City of Arden Hills Public Works Director recommends Council adopt Resolution #98-22, <br /> Approving Plans and Specifications, and Ordering the Advertisement for Bids in the Matter of <br /> the 1998 Street Improvement Project. The Director reminds Council that the Glenpaul overlay is <br /> not part of the plans and specifications and recommends Glenpau1 be considered for total <br /> . reconstruction at a future date. <br /> The Director also does not recommend the installation of a new sanitary sewer line on Stowe <br /> Avenue, as the existing line is in generally good condition. <br />