My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-27-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 04-27-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:43 PM
Creation date
11/10/2006 4:48:37 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . CITY OF ARDEN HILLS <br /> MEMORANDUM <br /> Date: April 22, 1998 <br /> To: Brian Fritsinger, City Administrator <br /> From: Dwayne Stafford, Public Works Director 1);. <br /> Subject: Monthly Department Head Report <br /> Puhlic Safety Commission <br /> The City of Arden Hills Public Safety Commission held a special meeting on April 16th, 1998 at <br /> the Army Reserve Center. This meeting featured three Ramsey County Sheriff Deputies plus the <br /> Public Safety Commission Chairmen, John Tholen, who is also a Deputy. The meeting was in <br /> response to approximately sixty residents who returned Safety Survey Sheets sent out last year. <br /> Those residents had indicated their desire to attend a Commission meeting to discuss traffic <br /> problems. <br /> Each resident who returned the survey, with traffic concerns, was sent a letter inviting them to <br /> attend the meeting, which was also publicized in the Bulletin newspaper. Only four residents, <br /> however, attended. <br /> . The Sheriff Deputies each spoke on their ideas toward traffic enforcement and discussed some <br /> of the problems they encounter along with some ofthe new things they are trying. <br /> A discussion followed with all attendees participating. <br /> Gateway <br /> The Gateway Street Project continues, however, slowly. This project should have been <br /> completed by now, with the ideal weather conditions this year. The contractor is currently <br /> installing the water main and storm sewer pipe on the new road. <br /> Welsh's building projects are moving faster, with all the steel frame work in place for Phase 4, <br /> and footing work well under way on Phases 2 and 3. <br /> 1997 Street Project <br /> The Public Works Director met on site with Central Landscaping people and explained why <br /> some of their work was unacceptable to the City. Central has since re-rolled most of the sod on <br /> James Avenue, and has agreed to re-grade and re-sod four small areas. Only two other small <br /> items remain to be addressed on the project punch list. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.