Laserfiche WebLink
<br /> . <br />EXHIBIT C <br /> . <br />Description of Work Time Frame <br />Engineering Walkout 0-6 months <br />Engineering Design 2-8 months <br />Commerce Permitting Day 75 <br />Fiber Optic Cable and Node Installation 11-16 months <br />Amplifier Replacement 12-24 months <br />Passive Equipment Replacement 18-36 months <br />System Balancing and Proof-of-Performance 36 months <br />Activation in Phases; Completion By November 30,2000 <br /> . <br /> . <br /> . <br /> -- <br />