Laserfiche WebLink
<br />".:\ ,>",-,,',: <br /> :".,'!" <br /> EXHIBIT D . <br />. NORTH SUBURBAN I-NET PERFORi'1:ANCE STANDARDS <br /> Upon completion of the I-Net upgrade: <br /> I. Video Transmission <br /> A. Video transmission will comply with the following performance: <br /> standards: <br /> t. Carrier to noise ratio = 45dB or better <br /> 2. Carrier to composite triple beat = 53 dB or better <br /> 3. Carrier to composite second order = 55 dB or better <br /> 4. Carrier to cross modulation = 55 dB or better <br /> 5. System signal level variations (peak to valley) = n + 10 + 2 or better <br /> for all coaxial cable portions of the I-Net (where N = the number of <br /> amplifiers in cascade). <br /> B. Testing will occur twice yearly following the timing established in CFR <br /> 76.601 and 76.605. <br /> t. From the institution to the longest subscriber cascade. <br /> 2. From the institution through the applicable headendlhub site <br /> returning back to the same institution. <br /> 3. Performed using existing I-Net carriers active it the time of the <br /> testing, which will subject them to service interuptions. <br /> 4. Completed at Company-designated entry demarcation point at the <br />. institution. <br /> 5. The system will meet calculated worst case fully loaded video and <br /> audio measurements, taking into consideration existing I-Net data <br /> loading at the time tbe measurement is taken. <br /> 6. Under ordinary operating conditions. <br /> 2. Digital Transmission <br /> A. For I-Net that is 50% or more coaxial cable, a Bit Error fulte of 1 X 10(-8) at <br /> the demarcation point. <br /> t. Outage times not included <br /> 2. Ordinary operating conditions <br /> B. For I-Net that is 50% or more fiber optic cable, a Bit Error Rate of 1 X 10(- <br /> 9) at the demarcation point. <br /> t. Outage times not included <br /> 2. Ordinary operating conditions <br /> C. For both coaxial and fiber network, the company will meet or exceed a <br /> reliability factor of 99.965% on an annual basis. <br /> D. Testing will occur twice yearly, during tbe months of JanuarylFebruary and <br /> July/August. <br />e <br />