My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-29-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 06-29-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:48 PM
Creation date
11/10/2006 4:49:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~ AlIERlCA\ CONSUL T A.~JIS <br /> . GEOTECH~>JICAL <br /> .l. E\GI\EERl\G . MA TERIALS <br /> . ENVIRON,',1ENTAl <br /> TESmG, I\C, <br /> . <br /> American Engineering Testing, Inc. <br /> St. Paul, Minnesota <br /> FEE SCHEDULE <br /> (Effective January 1, 1998) <br /> ENVTRONMENTALSERVICESFEESCHEDULE <br /> Descriotion Unit Rate <br /> I. EngineeringlTechnical Personnel Rates <br /> A. EngineeringlEnvironmentaJ Technician I per hour S 43.00 <br /> B. Drill Crew Person per hour 49.00 <br /> C. EngineerioglEnvironmental Technician II, NDT Level II per hour 52.00 <br /> D. Technician Level II CWI/CBO per hour 60.00 <br /> E. Drill Crew Chief per hour 60.00 <br /> F. Senior Engineeriog Technician III, NDT Level III per hour 62.00 <br /> G. Engineeriog Assistant per hour 72.00 . <br /> H. Engineer I, Geologist I, Scientist I per hour 75.00 <br /> I. Senior Engineeriog Assistant, Engineer II, per hour 85.00 <br /> Geologist II, Scientist II <br /> J. Senior Engineer, Geologist, Scientist per hour 95.00 <br /> K. Priocipal Engineer per hour 114.00 <br /> L. Principal of Firm per hour 125.00 <br /> M. Litigation Preparation per hour 150.00 <br /> N. Deposition or Court Time (4-hour minimum) per hour 185.00 <br /> The rates presented are portal to portal, with vehicle mileage, expenses and equipment rentals being additional. <br /> Reduced rates may be negotiated for long-term projects. <br /> Overtime for personnel categories A-F charged at above cost plus 25% for over 8 hours per day or Saturday; and at <br /> above cost plus 50% for Sundays or Holidays. Hazardous work charged at additional 25%. <br /> II. Vehicle Mileage (personnel time and rental extra) <br /> A. Personal AutomobilefIruck per mile 0.35 <br /> B. 3/4-ton Truck/Van per mile 0.48 <br /> C. I-ton or 2-ton Rig Auxiliary Truck per mile 0.60 <br /> D. I-ton Truck with Drill Rig per mile 0.65 <br /> E. 2Y:,-ton Truck with Drill Rig per mile 0.75 <br /> F. TraclOr/Lowboy Trailer per mile L05 . <br /> "AN AFFIRMATIVE ACTION EMPLOYER" <br /> 2102 University Ave. W. . St. Paul, MN 55114.612-659-9001. Fax 612-659-1379 <br /> Duluth. Mankato . Marshall. Rochester. Wausau <br /> ~- - - ----- <br />
The URL can be used to link to this page
Your browser does not support the video tag.