My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-29-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 06-29-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:48 PM
Creation date
11/10/2006 4:49:00 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . American Engineering Testing, Inc. 1998 Environmental Services Fee Schedule - Page 2 <br /> Descriotion Unit Rate <br /> III. Site Exploration Equipment Rental/Services <br /> A. Drilling Services (Includes drill rig, carrier <br /> and 2-person crew. Auxiliary vehicle extra.) <br /> 1. Rotary Drill on 4WD I-ton Truck per hour 145.00 <br /> 2. Rotary Drill on 2WD 2\4-ton Truck per hour 156.00 <br /> , Rotary Drill on 4WD 2\4-ton Truck per hour 160.00 <br /> J. <br /> 4. Rotary Drill on All-Terrain Vehicle per hour l85.00 <br /> 5. Portable, Non-rotary Rig per hour 156.00 <br /> B. Rig Auxiliary Vehicle Rental <br /> 1. 4-wheel Trailer per hour 5.00 <br /> 2. 3/4-ton Truck per hour 10.00 <br /> 3. I-ton or 2-ton Truck per hour 17.00 <br /> E. Environmental Equipment Rental/Service <br /> . 1. Photo ionization Detector per day 80.00 <br /> 2. Flame Ionization Detector per day 95.00 <br /> , Peristaltic Pump per day 25.00 <br /> J. <br /> 4. 2" Submersible Pump per day 150.00 <br /> 5. Dissolved Oxygen Meter per day 25.00 <br /> 6. pH Meter per day 12.00 <br /> 7. Conductivity Meter per day 12.00 <br /> 8. Monitoring Well Sampling Kit (inc. bailer, gloves, etc.) per well 17.00 <br /> 9. Monitoring Well Sampling Equipment (to 50') per day 70.00 <br /> 10. Monitoring Well Sampling Equipment (deeper than 50') per day 90.00 <br /> I!. ISCO Wastewater Sampler per day 35.00 <br /> 12. LEL Meter per day 25.00 <br /> 13. Methane Meter per day 25.00 <br /> 14. Air Velocity Meter per day 25.00 <br /> 15. Level C Protective Gear quoted per job - <br /> 16. Level B Protective Gear quoted per job <br /> 17. Level A Protective Gear quoted per job <br /> 18. Confined Space Equipment quoted per job - <br /> 19. Coliwasa Sampler each 15.00 <br /> 20. Bailers (Polypropylene) each 10.00 <br /> 21. Bailers (Teflon) each 20.00 <br /> 22. Vacuum Blower quoted per job <br /> 23. Groundwater Modeling Software per hour 25.00 <br /> . 24. Oil Water Interface Sensor per day 60.00 <br /> 25. Well Rate of Recovery Equipment per day 150.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.