Laserfiche WebLink
<br /> . <br /> CITY OF ARDEN HILLS <br /> MEMORANDUM <br /> DATE: August 25,1998 <br /> TO: Brian Fritsinger, City Administrator <br /> FROM: Dwayne Stafford, Public Works Director "y) <br /> SUBJECT: 1999 Street Improvements <br /> Request <br /> The City of Arden Hills Public Works Director requests the City Council adopt Resolution <br /> #98-56 authorizing the City Engineer, (BRW) to prepare a Feasibility Report for the City of <br /> Arden Hills 1999 Street Improvement Program. <br /> Backeround <br /> The City of Arden Hills will be reconstructing West Round Lake Road in 1999 which may use <br /> all of, or most of, the monies appropriated for street improvements in 1999. <br /> . As a result, staffrecommends that a Feasibility Report for any additional work include only <br /> necessary seal-coating and a study on the necessary steps to complete the reconstruction oftwo <br /> streets which were recommended for improvements in the 1997 and 1998 Feasibility Report. <br /> Those streets are: <br /> North Snelling Avenue from Arden Place to the Cul-de-Sac, where it appears a portion of <br /> the street was constructed outside of the right-of-way by as much as 60 feet, and; <br /> North Hamline Avenue from County Road E North to dead end. This street may need <br /> additional Right-of-Way to accommodate existing fire hydrants and an acceptable <br /> turnaround on the North end. <br /> Although some of these problems had been previously identified, no solutions had been offered. <br /> Staff believes these issues should be brought out and discussed with council so decisions can be <br /> acted on to insure these streets are ready for improvements as monies become available. <br /> Recommendation <br /> The Public Works Director recommends the City Council adopt Resolution #98-56 ordering the <br /> City Engineer (BRW), to prepare a Feasibility Report in the matter of the 1999 Street <br /> Improvement Project. <br /> . <br /> n_ <br />