My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-31-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 08-31-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:52 PM
Creation date
11/10/2006 4:49:18 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> CITY OF ARDEN HILLS <br /> MEMORANDUM <br /> DATE: August 13, 1998 <br /> TO: Brian Fritsinger, City Administrator <br /> FROM: Dwayne Stafford, Arden Hills Public Works Director ye; <br /> SUBJECT: Round Lake Road <br /> Request <br /> The City of Arden Hills Public Works Director requests Councils consideration of having the <br /> City Engineer review the Gateway Business District Feasibility Study done in May, 1997 as it <br /> pertains to Round Lake Road. <br /> Background <br /> The City of Arden Hills received a Feasibility Study in May of 1997 which addressed <br /> improvements and options related to Round Lake Road and the Gateway Business District. At <br /> that time it was Staffs understanding, the City Council favored a Boulevard type roadway, with <br /> . a landscaped median, possible irrigation system, lighting, and enhanced landscaping. Upon <br /> discussion of this with City Engineer Brown, quick cost estimates for that portion of Round Lake <br /> Road between the south edge of the Indykiewicz property and Gateway Boulevard may exceed <br /> those cost estimatcs provided by the Feasibility Study. Under these circumstances, Council may <br /> wish to have the City Engineer do a review of the 1997 Feasibility Study including cost <br /> estimates. Receiving the Engineers review may help Council determine the type of roadway and <br /> enhancements most appropriate. <br /> Recommendation <br /> The Public Works Director recommends Council instruct the City Engineer to review and verify <br /> costs estimates and options provided in the May 1997 feasibility study relating to Round Lake <br /> Road. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.