My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-31-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 08-31-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:52 PM
Creation date
11/10/2006 4:49:18 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ----- <br />Monthly Department Head Report Page 2 - <br />Public Works <br />Public Works employees disconnected the sewer and water service lines to the old City Hall. Gas . <br />and electric have also been disconnected. <br />More manhole repairs were made when a sink hole was discovered on Hamline Avenue and <br />Tiller Lane where one side of a manhole collapsed. Attached is a picture of this one showing a <br />portion of the manhole missing around two pipe and the resulting sink hole. <br />In that same area the Public Works crew is cleaning out a ditch along Hamline which is causing <br />back ups in some areas. This is a relatively simple ditch to clean as it can be accessed from the <br />roadway. <br />The lift station just below the east side of Perry Park has been painted with graffiti so often by <br />vandals that Public Works decided to paint it tan, rather than power washing the structure with <br />chemicals each time. This will allow Public Works to paint only over graffiti areas with <br />matching tan paint. <br />Several sewer manhole covers which snow plows have hit, as a result of settlement of the <br />roadway around the covers, have been dug up and lowered. Even though most of the City's <br />plows are designed to trip when an obstacle is hit, it still can be a serious jolt to the driver and <br />equipment. <br />Clearing of another sewer easement, this one east of Hudson Road has been completed. It is a <br />Public Works goal to get all the sewer easements cleared to provide easy access to sewer lines. . <br />Infratech has started on the repair work of those areas identified for repair during the 1996 sewer <br />televising. BRW is monitoring this work. <br />Several fire hydrants with known problems were repaired, grass cutting on boulevards, and some <br />tree trimming has been done as time allowed. <br />Public Works Director <br />Some of the projects the Public Works Director has been working on include: <br />. Gateway inspection (utilities & quantities) <br />. Drainage ditch evaluation <br />. Lift Station #3 conversion <br />. NSP rates on water pumping <br />. Finalizing specifications for a new back up generator <br />. 1998 & 1999 Street Improvements <br />Fred Reed continues to recover from his triple by-pass surgery and has indicated he expects to <br />return to work on September 21,1998. <br /> . <br /> ----- <br />
The URL can be used to link to this page
Your browser does not support the video tag.