My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-31-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 08-31-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:52 PM
Creation date
11/10/2006 4:49:18 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Lastly, if the City denies tbe petitioners request, "... it must state in writing the reasons for the . <br /> denial at the time that it denies tbe request." <br /> Recommendation. The Planning Commission, at their July 1, 1998 regular meeting, <br /> approved Planning Case 98-17, Minor Subdivision of Outlot A, McClung First Addition, <br /> easement vacation, and variances (lot depth and area) on Parcel B based on the Findings - Lot <br /> Depth Variance (Parcel B) and Findings - Lot Area Variance (Parcel B) sections of the Staff <br /> Report dated July 1, 1998, subject to the following conditions: <br /> 1. Payment of the appropriate park dedication fee. <br /> 2. Provision of calculations, in a form acceptable to the City Engineer, determining the <br /> appropriate size ofthe replacement area for the easement area which is to be vacated. <br /> 3. Provision of drainage and utility easement in a form acceptable to the City Attorney, <br /> prior to consideration ofthis request by the City Council <br /> 4. Informing the buyer(s) of Parcel A and B, by the applicant, of the restrictions <br /> imposed by the drainage easement in potential building expansion or deck <br /> construction. <br /> 5. Recording the subdivision in the form of a Registered Land Survey. <br /> 6. Provision of the necessary drainage and utility easements along the property lines, <br /> as required by the City Code, in a form acceptable for filing with Ramsey County. <br /> Updates. <br /> Condition #1 The Planning Commission recommendation requires the payment of the . <br /> appropriate park dedication fees. The Community Development Director has prepared a <br /> memorandum regarding the required park dedication fee, which is attached as Exhibit B. <br /> The Community Development Director recommends an additional condition which would <br /> state: "Payment of the park dedication fee shall occur prior to recording of the minor <br /> subdi vision." <br /> Condition #2 The Planning Commission recommendation requires the proVIsion of <br /> calculations for the drainage area that runs through the site in a form which is acceptable to <br /> the City Engineer. The applicants engineer has provided the City Engineer calculations on <br /> the 100 year elevation for this pond. The pond and its new easement is shown on Exhibit C. <br /> The 100 year flood elevation for this pond is at an elevation of915.6. The City Engineer had <br /> accepted the calculations which determined this elevation. <br /> The City Engineer requests that an additional condition be added to the approval of this <br /> request which would require that the lowest floor elevation of homes on Lots A and B be at <br /> least two feet higher than the 100 year flood elevation. Therefore, the City Engineer is <br /> recommending that an additional condition be added which would state: "The lowest floor <br /> elevation for Lots A and B shall be at an elevation no lower than 917.6." <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.