My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-28-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-28-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:55 PM
Creation date
11/10/2006 4:49:30 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OVERVIEW <br />A summary of the scope as it relates to electronic media technology is as follows: . <br />The scope of work in this proposal includes the following phases: <br />City Council Chambers & Controt Room. <br />Phase 1: Strategic Planning (Items #1 & 2 as noted in RFP) <br />Prognun Document <br />Preliminary Budget Estimate <br />Schematic Design Development <br />Phase 2: General Construction Provisions <br />(Item #3 as nnted in the RFP) <br />Architectural Recommendations <br />Mechanical Recommendations <br />Electrical Recommendatioos <br />Phase 3: Electronic Media Systems Design and Specifications <br />(Item #3 as noted in thc RFP) . <br />Media System Design <br />RFP or RFB Preparation <br />Proposal or Bid Administration <br />Phase 4: Electronic Media Systems Construction Administration <br />(Item #3 as noted in the RFP) <br />Site Inspections <br />Contractor Pay Request Processing <br />Punch List <br />Training Administration <br /> . <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.