My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-28-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-28-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:55 PM
Creation date
11/10/2006 4:49:30 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SCOPE OF SERVICES Phase 2 <br />Phase 2: General Construction Provisions . <br />Work in the Design Development Phase, as it pertains to the Architectural, <br />Electrical and Mechanical needs for Electronic Media Systems, includes: <br />. Assisumce in determining critical viewing distances and establishing design parameters for <br /> the integratioo of visual etectronic displays into the building <br />. Assisumce with determining building space atJotmcnts, ratios and acoustidnoise control <br /> perfonnance requirements <br />0 Review and comment 00 Architectural, Mechanical and Electrical Coostruction <br /> Documents and one (t) iteration of non-construction release drawings <br />. Recommendatioos via text or me (t) iteratioo of non-construction release drawings for <br /> millwork to be designed by the architect (e.g., casework performance requirements, <br /> equipment dimensions, locations, etc.). Actual "design" work would be considered an <br /> additiooal scope item and will be quoted as an additiooal fee. <br />0 Review of millwork and custom fi.nniture drawings <br />0 Design of raceways necessary for low voltage portioos of electronic media s)'rtems <br />0 Identification of power locatioos, perfonnance requirements and device types <br />0 Provide technical lighting guidelines, zooe/level performance requirements, control system . <br /> performance requirements to others for design and specification <br />0 Provide specifications for equipment to be built-in to General Contractor's scope of work <br />0 Provide adjacency and noise control performance requirements for HV AC systems <br />0 Review and comment on Architectural Shop Drawings, if deemed necessary or desirable. <br />Deliverable #1: <br />Notfor- construction reference drawings showing locatiom, sizing, etc. <br />Deliverable #2: <br />Text recommending specific related needs and peifonnara design criteria <br />Deliverable #3: <br />Standard specification t~t in divisions requiredfor inclusion in bidding oocumenrs hy Olocrs. <br />Deliverable #4: <br />Revicl1' and submittal of markup and stamp "7th recommendations. <br /> . <br /> 4 <br /> -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.