My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-28-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-28-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:55 PM
Creation date
11/10/2006 4:49:30 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. SCOPE OF SERVICES Phase 4 <br /> Phase 4: Electronic Media Systems Construction Administration <br /> . Conduct a project start-up meeting with the Electronic Media Systems Contractor <br /> and Owner (if applicable) <br /> . Six (6) site meetings <br /> . Administrate details necessary for awarded contract <br /> . Administrate Electronic Media Systems Contractor's adherence to contract <br /> documents <br /> . Establish project schedule, terms and conditions <br /> . Field coordination and Change Order processing (if required) <br /> . Review shop drawings submitted by Electronic Media Systems Contractor <br /> . Administrate Pay Request processing in relationship to percentage completion <br /> . Conduct occasional scheduled conference calls with Owner, Media Systems <br /> Contractor and other team members as needed <br />. . Issue two (2) punchlists (a preliminary and a final issue on the electronic media <br /> systems) <br /> . Administrate sign-off and electronic media systems commissioning <br /> . Conduct format project close out. <br /> *This Phase contains a total of six (6) site meetings. Any additional meetings will be <br /> charged as additional scope. <br /> Deliverable #1: <br /> issue Project Status Reports (PSR 's) at appropriate intervals <br /> Deliverable #2: <br /> Process Ou.ner supplied or Electronic Interiors, Inc. supplied change order forms <br /> Deliverable #3: <br /> Text comments and stamp <br /> Deliverable #4: <br /> Process pay requests on CMner suppliedfarms. <br />. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.