My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-28-1998
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1998
>
CCP 09-28-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:55 PM
Creation date
11/10/2006 4:49:30 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> --.- <br /> . <br /> EXCLUSIONS . <br />The following items have not been included in this proposal. Any specific needs <br />involving these areas can be reviewed for amendment to this proposal. Please contact <br />Kate O'Reilly at Electronic Interiors, Inc. for further clarification of any exclusions listed <br />in this proposal. <br />. Responsibility for giving direction to Genera!, Eteclrical or Mechanical Contractors <br /> (verbal or written) <br />. Responsibility for Architectural, Mechanical, Electrical or Structural Construction <br /> Drawings or Documents <br />. Design of telephone systems or data systems other than relevant location <br /> coordination <br />. Custom design modifications to factory assembled components or equipment that <br /> carry warranties. Non-factory authorized use of manufactured equipment <br />. Providing Structural Engineering recommendations or review <br />. Review of Structural Construction Drawings or Documents <br />. Providing custom casework and millwork dcsign REFER TO PHASE 2 <br />. Preparation of Electronic Media Systems Contractor's contract as a document . <br /> separate from the preparation of Project Manual as contract document <br />. Re-development of any work, in any phase, after Owner sign off on that pbase <br />. Providing punch!ist and probtem resolution other than wbat has been stated in the <br /> proposal <br />. Demonstrations of systems or equipment <br />. Acoustical consulting. <br />Owner will determine: <br />. All project requirements prior to start of Design Development Phase. After start of <br /> Design Development Phase, all changes will be charged as additional scope of <br /> servIces. <br /> . <br /> 8 <br />----.-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.