Laserfiche WebLink
<br /> . . <br /> Memorandum, 1999 Street Improvement Feasibility Report, WRLR (phase II) . <br /> Page Two <br /> November 5, 1998 <br /> Cost Summary <br /> Alternative <br /> A B Cl C2 <br /> Roadway Imp. $ 823,375 $1,449,150 $1,920,700 $1,262,390 <br /> Storm Drainage 180,160 245,110 260,410 199,310 <br /> Imp. <br /> Watermain Imp. 230,550 230,550 230,550 230,550 <br /> Est. R-O-W Costs 10000 74 000 1 50 000 1 50 000 <br /> Est. Costs before $1,244,085 $1,998,810 $2,561,660 $1,842,250 <br /> Enhancemeots <br /> Bituminous Trail 17,140 17,140 17,140 N/A <br /> Streetlights N/A 109,872 109,872 N/A <br /> Landscaping N/A 120,200 120,200 N/A <br /> Irrigation N/A 27,468 27,468 N/A . <br /> Total Costs with $1.261.225 $2.271 490 $2 RJn.J40 $1.842.250 <br /> Enhancements <br /> Fundin~ Summary <br /> Assessments $ 370,500 $ 370,500 $ 370,500 S 370,500 <br /> Water Utility 230,550 230,550 230,550 230,550 <br /> Storm Water , <br /> - 0- 64,950 80,250 19,150 <br /> Utility <br /> General Fund 151,000 151,000 151,000 151,000 <br /> MSAS 500 000 500 000 500 000 500 000 <br /> Construction <br /> Funding $1.252,050 $] ,3] 7.000 $1.332,300 SI,27],200 <br /> Subtotal <br /> Funding Gap 9,175 956,490 1,504,040 571,050 <br /> Total Funding $1 ~2hl 22~ $2.273.490 $2.836.340 $1.842.250 <br /> Needs, including .. <br /> Enhancements <br />